盖茨黑德千僖桥概要1.docVIP

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
盖茨黑德千僖桥概要1

The bridge was transported section by section from Watson Steel, Bolton (where it was fabricated) to the AMEC works in Wallsend, Newcastle. It was here that AMEC welded the sections together and painted the bridge with a weather resistant paint ready for its use on the River Tyne. The finished bridge was transported six miles up the river to its final position in Gateshead in November 2000. It was carried using Europes largest floating crane - Asian Hercules II. At certain points the bridge was wider than the river, and had to be turned sideways to squeeze its way through. It was finally lowered into position with just 2mm to spare. Asian Hercules II has a deck the size of a football pitch. The main lifting legs project over 350 ft tall - some 60 ft higher than Big Ben and almost as tall as the London Eye Millennium Wheel. The 10,560-ton barge is over 250 ft long and over 100 ft wide. It has enough power to lift a weight equal to over 4,000 cars. However, it has a very small crew - only 12 people - who all live onboard. The living quarters are outfitted like a modern hotel with a full time chef and rooms for 20 people. On 28 June 2001 the bridge underwent its first tilt. 36,000 people from all over the UK lined the banks of the River Tyne to watch. Asian Hercules II - Specifications Length: 91.00 metres Breadth moulded: 43.00 metres Depth moulded: 8.50 metres Max/Min draft: 5.00 /2.40 metres Gross tonnage: 10,560 tons Net tonnage: 3,168 tons Displacement: 16,500 tons (even keel) Speed: 7 knots The Gateshead Millennium Bridge celebrates its tenth anniversary this year on Saturday 17 September - and a host of activities are being organised to help you to join us in celebrating its anniversary. We will be updating this page regularly – so bookmark it now! Julien Dupont vs The Gateshead Millennium Bridge Bridge lights up the sky Do you share your birthday with the bridge? Daily tilts Bridge Tales Back To Top Julien Dupont vs The Gateshead Millennium Bridge On Tuesd

文档评论(0)

676200 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档