2011市政实务(2011 municipal practice).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011市政实务(2011 municipal practice)

2011市政实务(2011 municipal practice) (a total of 20 multiple-choice questions, 1 points for each question, options for each question, only one of the most with 1), prestressed concrete pipeline should be set to the lowest point (A) A. B. C. exhaust hole drainage hole grouting hole D. overflow hole 2, heavy soil pile construction should not be used when the water jet construction method the (A) A. B. C. clay sand gravel stratum D. sand layer 3, the construction of bridge closure section is wrong (D) A. before closure should be concrete strength B. temperature observation and beam height and spacing of the cantilever end closure segment should improve the level of C. closure segment length should be 2mD. at the highest temperature, pouring 4 15m arch bridge is correct to say that (C) A. as the bridge width using the block method of pouring B. should adopt the method of piecewise C. pouring should be in support of arch foot at the beginning of the concrete pouring completed before the D. bridge 5, the dewatering project statement is correct (P 111C) is conducive to enhancing the strength of soil environmental safety B.C. A. precipitation construction, to recharge D.6, wet surface construction is correct to say that (D) A. should adhere to the mix, how much, how much pressure, shop to complete the number of B. rain not complete, as soon as possible to prevent rolling, rainwater infiltration C. day digging stick finish, complete, finished, leaving troubles. D. cement concrete pavement should be fast vibration, smooth and molding, 7, lime stabilized base construction is wrong (D). A. should be used in silty clay and clay plasticity index of 10~15, 1~3 should adopt new lime B. pulverized lime without digestion using C. directly block gray before using 2~3d digestion D. digestion lime particle size not greater than 20mm8, the temperature of the modified asphalt (B) paving temperature of 150 DEG A. grind, start temperature of 140 DEG B. paving temperature is 160 degrees, rollin

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档