网站大量收购闲置独家精品文档,联系QQ:2885784924

2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer).doc

2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer)

2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer) Complete A 顎?technical clarificaiton records B 顎?quality control data and documents shall be complete C 顎?construction log integrity D 顎?resources configuration record intact 39 顎?record project has a steam drum installation of the boiler heating surface installation, 顎?顎?record, economizer installation, etc. A 顎?water wall cold drawn B 顎?induced draft fan installed C 顎?for pump installation D 顎?deaerator installation 40 顎?boiler installation in case of electrical equipment on fire when 顎?顎?should first cut off power supply must not use 顎?顎?put out the fire. A 顎?halogenated B 顎?water C 顎?ammonium phosphate powder 2 D 顎?carbon dioxide, multiple-choice 顎?顎?10 questions 2 points each. In each alternative 顎?to match 顎?idea has two or more than two Theres at least one wrong term. Wrong to choose subject less scoring 顎?顎?顎?the selected each option 顎?0.5 points Scene 顎?seven 顎?a installation company to undertake a gas power generation engineering project department according to the engineering characteristics 顎?顎?installation company created Worker organization design 顎?顎?scheme regulations of 1000 m3 LPG spherical tank welding should be preheated before 顎?welding work completed junior Line integral heat treatment 顎?the 顎?water filling experiment equipment installation and adjusting method to the amount of each group of shim 顎?to the regulations Gas turbine rigid coupling alignment with a dial indicator measuring 顎?after completion of main steam pipe steam purging. According to the scenario 顎?seven 顎?顎?answer the following questions 顎? 41 顎?gas turbine types of the rigid coupling 顎?顎? A 顎?flange type B 顎?sleeve C 顎?friction type D 顎?mesh type E 顎?clip shell 42 顎?gas generator installation process 顎?in the equipment layout and foundation between each group of shim for 顎?顎?block. A 顎?2 3 B 顎? C 顎?4 D 顎?5 E 顎?6 43 顎?with large flow steam purging main steam pipe 顎?should b

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档