- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD)
中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD)
Zhongshan jiaming power co., LTD. 3x390mw gas-steam combined cycle
Report on environmental impact of cold and heat power generation project
(short form)
I. project overview
1. Origin of project
Zhongshan hengmen power plant is located in ma saddle island of the torch development zone of the pearl river estuary. The first and second unit of the power plant (2 x 125MW) was put into operation in 1997, and the oil changed in 2007. The second phase iii, no. 4 (2 x 350MW) was completed and put into operation in 2009. The existing units of the power plant are generating units without heating capacity.
Zhongshan torch development zone was founded by the former national science and technology department, the government of guangdong province and the government of zhongshan city in 1990. According to the national science and technology commissions approval of the area of zhongshan torch high-tech industrial development zone: the total effective area is 15.1 km2, among which the area of policy area is 9.8 km2, and the newly built area is 5.3 km2.
The heat load of torch development zone, the heat load to the rapid growth of the residential, commercial office cooling load demand, therefore, according to the zhongshan torch high-tech industrial development zone, south lang for thermal power plant planning, zhongshan jiaming power co., LTD., in the subordinate three power plants in the reserve construction unit 9 f gas heating and electrical installations, on zhongshan torch high-tech industrial development zone, south area for thermal power plant, installations, lang, meet the demand of south district central heating, cooling, lang.
In response to a planning requirements, focus on the future development, zhongshan jiaming power company limited to invest in the construction of zhongshan jiaming power company limited 3 x 390 mw gas - steam combined cycle cold hot electricity co-generation project, the expansion project plans to b
您可能关注的文档
- Terrasolid系列产品介绍(Terrasolid series product introduction).doc
- tfyhd(tfyhd).doc
- tex命令(Tex command).doc
- The First Snow(第一场雪).doc
- The Mid-Autumn Festival(中秋节).doc
- THERMO培养箱---中文说明书(THERMO incubator - Chinese manual).doc
- Transient thermal stress analysis(瞬态热应力分析).doc
- ToHeart2 XRATED攻略(ToHeart2 XRATED strategy).doc
- Translate_english(Translate_english).doc
- SW6v6.0 的修改说明(Changes to sw66.0.0).doc
最近下载
- Unit 6 Rain or Shine (第3课时) 课件人教版(2024)英语七年级下册.pptx VIP
- 港珠澳大桥岛隧工程沉管隧道混凝土质量控制措施.pdf
- 2025年中考数学复习热搜题速递之尺规作图(2024年7月).docx
- 股市风险预警机制-深度研究.pptx
- 政策解读2025年中央一号文件PPT.pptx VIP
- 5.0MPa路面抗折混凝土配合比.docx VIP
- 17J927-1 车库建筑构造(OCR).pdf VIP
- XX市疾病预防控制中心-艾滋病HIV筛查实验室管理手册_精品.doc
- 2025年春季小学学校德育工作计划(1975字).docx VIP
- 渤海水泥厂包装车间除尘系统设计.docx
文档评论(0)