网站大量收购独家精品文档,联系QQ:2885784924

中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD).doc

中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD)

中山嘉明电力有限公司(Zhongshan jiaming electric power co. LTD) Zhongshan jiaming power co., LTD. 3x390mw gas-steam combined cycle Report on environmental impact of cold and heat power generation project (short form) I. project overview 1. Origin of project Zhongshan hengmen power plant is located in ma saddle island of the torch development zone of the pearl river estuary. The first and second unit of the power plant (2 x 125MW) was put into operation in 1997, and the oil changed in 2007. The second phase iii, no. 4 (2 x 350MW) was completed and put into operation in 2009. The existing units of the power plant are generating units without heating capacity. Zhongshan torch development zone was founded by the former national science and technology department, the government of guangdong province and the government of zhongshan city in 1990. According to the national science and technology commissions approval of the area of zhongshan torch high-tech industrial development zone: the total effective area is 15.1 km2, among which the area of policy area is 9.8 km2, and the newly built area is 5.3 km2. The heat load of torch development zone, the heat load to the rapid growth of the residential, commercial office cooling load demand, therefore, according to the zhongshan torch high-tech industrial development zone, south lang for thermal power plant planning, zhongshan jiaming power co., LTD., in the subordinate three power plants in the reserve construction unit 9 f gas heating and electrical installations, on zhongshan torch high-tech industrial development zone, south area for thermal power plant, installations, lang, meet the demand of south district central heating, cooling, lang. In response to a planning requirements, focus on the future development, zhongshan jiaming power company limited to invest in the construction of zhongshan jiaming power company limited 3 x 390 mw gas - steam combined cycle cold hot electricity co-generation project, the expansion project plans to b

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档