二建市政工程(试题6)(2. Municipal engineering (test 6)).docVIP

二建市政工程(试题6)(2. Municipal engineering (test 6)).doc

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二建市政工程(试题6)(2. Municipal engineering (test 6))

二建市政工程(试题6)(2. Municipal engineering (test 6)) 1. Single item selection (total 20, 1 point for each item). Only 1 of the candidates in each question are most suitable for the topic. The first problem is that the gas pipeline should be graded according to the air pressure, because the gas pipeline () has strict requirements compared with other pipelines. A. explosion-proof sex B. rigor C. flammability Toxicity of D. [the correct answer] : B Question: Gas pipeline should be graded according to gas pressure, because of gas pipeline rigor compared with other pipe, have special strict requirements, leak could lead to fire, explosion, poisoning or other accidents. Therefore, choose B. The main purpose of setting up the initial sink in the urban sewage treatment plant is to remove the inorganic matter in the sewage well, so it is usually set in the biological treatment structure (). Behind A. In front of B. C. side D. Both before and after [the correct answer] : B Question: The initial sedimentation pool has a good effect on the removal of the inorganic material, which is usually set in front of the biological treatment structure. Therefore, choose B. Section 3 reinforced concrete Quito is used to construct the rockery under the (). A. lake sediment B. Floating water or uneven soil C. dry area D. Better soil [the correct answer] : B Question: The reinforced concrete base is used for the construction of rockery under the flow or uneven soil. Therefore, choose B. When the pipeline is installed, it shall be adjusted correctly. The side of the section and the inner bottom elevation B. the center of the pipe and the top of the pipe C. Central and inner bottom elevation of pipe section D. the side line of the pipe section and the top elevation of the tube [the correct answer] : C Question: When piping installation, the center of the pipe section and the inner bottom elevation shall be adjusted correctly. So choose C. Problem 5 is based on engineering practice experience, when th

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档