二级导线(The secondary conductor).docVIP

  • 32
  • 0
  • 约1.01万字
  • 约 18页
  • 2017-07-15 发布于河南
  • 举报
二级导线(The secondary conductor)

二级导线(The secondary conductor) -- NASEW V3.0 -- * * control network overview * * The result is the result of [flat] net processing The database is: C: \ DOCUME ~ 1 \ YJC \ desktop \ second wire.obs 2. Control network: The direction azimuth is the XY point TBD 70.34 30 Fixed 0 0 0 6 Class 0 0 0 0 0 0 0 0 0 0 0 0 The error condition of the basic observation before and after adjustment: The observed value is even before the adjustment Direction error: 0.000566 0.000660 Fixed error: 0.01,01165 Proportional error: 5.005.83 4. Maximum error in control network: Maximum point error = 0.03498 m Maximum

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档