变电题库(Substation question bank).docVIP

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变电题库(Substation question bank)

变电题库(Substation question bank) 1. Fill in the blanks 1. Inspection of equipment inspection of transformer substation, generally divided into (general inspection) (inspection tour)) (special inspection) 2. The equipment for spare or to be used shall be considered as a running equipment for periodic (inspection) and (maintenance). 3, set control station during on duty personnel on duty should check in time to reduce the substation to upload information, every two hours for all (pictures), to reduce the substation (reports), () to upload information comprehensive check one more time. 4. The battery shall be checked (voltage) and (temperature) in accordance with the regulations, whether the connection is fastening, whether there is heating or oxidation, whether the battery container is (broken) and (leakage). 5. The touring project of the substation in the backstage machine: should inspect the main wiring diagram to match the position of the (actual device), and the remote measurement shows that it is correct. Deal with alarm window, event order record, (to protect the event log), remote communication shift record, alarm signal) (the inspection tour of the login information such as presence of abnormal signal. 6, in an emergency, oil-immersed natural cooling and air cooling transformer allow short-time overload operation, environment temperature below 20 degrees and, allow the load (30%), environmental temperature 30 degrees, allow the load (15%). But the overload runs no longer than (24) hours. 7, voltage than different and impedance voltage transformer in any one will not overload, can run parallel, but voltage contrast values should not be more than (1%), the impedance voltage difference should not be more than (10%), capacity than should not be more than (1/3), different transformer connection group is strictly prohibited in parallel, different impedance voltage transformer should be appropriately raise the impedance voltage of the large transformer secondary volta

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档