- 1、本文档共54页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文文献翻译(Foreign literature translation)
外文文献翻译(Foreign literature translation)
English translation:
The delay of the high voltage circuit breaker
In this paper,
The operation of the circuit breaker affects the reliability of a power system. A good indicator of the state of a circuit breaker is
Its switching time. Based on this, some circuit breakers can be detected and removed before failure
In addition to. In this paper, the two different circuit breakers for spring drive and hydraulic transmission are proposed for different faults
The time measurement evaluation of the situation. In addition, the relationship between the time of the breaker switch and the type of failure type is also
Well deduce that. Therefore, the impact of the fault trend will also be considered.
Key words: circuit breaker; Maintenance; The timing; Condition assessment; reliability
1 the introduction
Today, the reliability of a power system is very important, and the circuit breaker is the most important group in the power system
Reliability is critical in part. Therefore, special lines and off-line measurement systems are used to evaluate
The state of the circuit breaker. Their task is to report various changes in the operation of the circuit breaker. However, the circuit breaker
Is a device that runs in a variety of different conditions, such as rated/short circuit current or high/low ambient temperature. It is held
Time is not equal to all things. Therefore, the fault state must be distinguished from the normal operation state. However,
And it doesnt seem like a trivial task.
The test technique considered in this paper is the measurement of switching time of the switch, namely the so-called delayed property. To detect
The time to be measured in an abnormal condition is compared with the reference time.
Although this method is very old, it is rarely detected by this method, which can cause this situation
The main reason is that the failure rate is very small, which is equivalent to six failures per 100 circuit breakers every year.
您可能关注的文档
- 发电厂专业题库(Power plant specialty library).doc
- 发电厂升压站的保护(Protection of power station booster stations).doc
- 发电厂管道、容器的检修(Maintenance of pipe and vessel of power plant).doc
- 发电机的工作原理(The working principle of the generator).doc
- 发电机词汇(Generator vocabulary).doc
- 发电机维修保养资料(Generator maintenance information).doc
- 发电车百题文库(Power generation car 100 library).doc
- 发挥性能极限-CPU超频的魅力(Performance limit - CPU super - frequency charm).doc
- 发界英文及解释(English and interpretation).doc
- 受累塑化剂 统一难敌康师傅(The use of plasticizer to unify the difficult enemy master kang).doc
文档评论(0)