工作要求(Job requirements).docVIP

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工作要求(Job requirements)

工作要求(Job requirements) Electrical installation work in construction projects due to cooperate with other professional engineering and technical content is higher, requires supervision engineer should not only be familiar with the design drawings, and be familiar with related construction and acceptance procedures, specifications, knowledge of site construction management and coordination. The author has described the common problems and treatment measures in the construction electrical supervision for several years. Common problems in design drawings At present, the design and construction time of high-rise buildings are very fast. In the past, the electrical design time of high-rise buildings usually took two or three months, and now it is usually about one month. The design drawing has not been carefully reviewed, and the basement construction has been fully expanded. Enter the standard layer and work at the speed of every four or five days. If the work is done on a regular basis, it will either affect the period or even the economic benefit, or the drawings are not carefully reviewed, resulting in a large number of changes and claims. This requires the supervisor to enter the role as soon as possible, contact with the developer and design institute, and understand the project situation and design intention. After getting the drawing, I will look at the drawing carefully and organize the drawing to review, and urge the design institute to give the consultation opinion as soon as possible. Sometimes supervision company according to particular case organization came step by step with emphasis, such as the basement of the electrical equipment, embedded pipeline is more, and the general earthing body welding, construction is big, can first organization in the basement. The blue prints.the design Some design personnel fluidity big, even temporary recruitment, composition, design quality is low, service awareness is poor, the sense of responsibility is not strong, somet

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档