- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政二级笔记(Second level notes)
市政二级笔记(Second level notes)Determination of construction sequence of urban road worksAccording to the requirements of the construction period, according to the design of urban road engineering drawings, combination with the engineering construction conditions, natural conditions, labor, materials, machinery and technology), the choice of the reasonable construction sequence is to determine the construction plan and preparation of construction schedule first issue to consider.Urban road projects can be divided into soil based engineering, roadbed engineering, road engineering, bridge engineering, tunnel engineering, drainage pipeline and public pipeline. The sequence of their respective construction is different: the soil foundation project generally goes in and out of the plane, burying the underground pipeline first, first digging the side and then filling the ground, first the soil base and then the road surface; The bridge project is the upper part of the lower part, the main body after the subsidiary; Water engineering is a priority in flood season control. The general construction sequence shall be determined in the following principles:(1) it must meet the technological requirements.(2) the construction equipment should be used in accordance with the input.(3) the quality of construction must be ensured.(4) the influence of hydrological, geological and meteorological factors on the construction should be given full consideration.(5) priority should be given to key project progress requirements affecting the overall situation, and the order of construction of each process should be arranged so as to focus on the key projects when necessary.(6) it embodies the basic principles of construction organization, namely the continuity, coordination, balance and economy of the construction process.(7) the requirements for safe production must be considered.Examination and approval procedures for urban road excavation1. Make urban road excavation project construction plan
您可能关注的文档
- 夏天千万不要让BB穿洞洞鞋(Never let BB wear hole shoes in summer).doc
- 夏季蔬菜栽培技术谨记十大要点(The summer vegetable culture technology to remember the top ten points).doc
- 夏季池塘水质培养措施 _水质调节技术_Xinnong_com(Summer pond water quality training measures _ water quality regulation technology _Xinnong_com).doc
- 外建归纳(Outside the building of induction).doc
- 外科复习题(Surgical review).doc
- 外科习题二(Surgical problem 2).doc
- 外文文献翻译(Foreign literature translation).doc
- 多媒体课室常见故障分析(Common failure analysis of multimedia classroom).doc
- 多层砖房裂缝的根源(The root of the cracks in multi-storey brick houses).doc
- 多轴后处理的写法(Multi-axis postprocessing).doc
- 2024年营养型输液项目项目投资申请报告代可行性研究报告.docx
- 专题21.6反比例函数的图象(举一反三讲义)数学沪科版九年级上册.pdf
- 专题21.5实际问题与一元二次方程(举一反三讲义)数学人教版九年级上册.pdf
- 2024年现场水质仪器项目项目投资需求报告代可行性研究报告.docx
- 2024年导电剂项目项目投资申请报告代可行性研究报告.docx
- 2024年数字无绳电话投资申请报告代可行性研究报告.docx
- 2024年手机银行项目项目投资筹措计划书代可行性研究报告.docx
- 2024年气化设备项目项目投资需求报告代可行性研究报告.docx
- 2024年数控石油深井测井仪项目项目投资需求报告代可行性研究报告.docx
- 专题21.7反比例函数的性质(举一反三讲义)数学沪科版九年级上册.pdf
文档评论(0)