引水隧洞塌方处理(Water diversion tunnel collapse treatment).docVIP

引水隧洞塌方处理(Water diversion tunnel collapse treatment).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
引水隧洞塌方处理(Water diversion tunnel collapse treatment)

引水隧洞塌方处理(Water diversion tunnel collapse treatment) On September 20, 2008 diversion tunnel collapse treatment diversion tunnel cave-in asain asain ya-wei luo (China water conservancy and hydropower construction bureau, three branch of chengdu salween, 7, 611130) abstract: this paper introduces the color, the ancient plant carbonaceous thousands of coal and rock mass collapsed after the tunnel, adopting small catheter consolidation, i-steel use network support, since the bolt lock, smooth, safe, successful efficiently overcome the TaFangTi long length, large cave-in height, carbonaceous thousands of surrounding rock in coal water softening exposed space construction problems easy to occur landslides, and affected by the collapse of its upstream and downstream support seriously distorted deformation hole section of a successful treatment, solves the outstanding security hidden danger, the tight construction problems and contradictions, such as reference, reference for similar project. Key words: large area collapse; Small catheter consolidation; I steel support; Network spray protection; Prefaces ancient hydropower station diversion tunnel arrangement in the black river right bank diversion to bare not Sue GouGou mouth underground powerhouse in the left bank of the upstream power, total length of 10.191 km, the tunnel cross section is round, diameter 9.0 m, inlet bottom elevation EL. 1849.0 m, the reinforced concrete lining is used in diversion tunnel across the Ⅲ segment lining thickness, Ⅳ, Ⅴ class surrounding rock respectively 40 cm, 50 cm and 80 cm. Ⅳ, Ⅴ rock consolidation grouting surrounding, tunnel crown of backfilling grouting. Construction of the first hub project and the diversion tunnel k0-005m ~ K1 + 880.00 m for the construction of the project; Among them, the total length of the construction hole is 466.5 m, the branch number of the hole and main hole is K0 + 841, the upstream water diversion tunnel length is 846m, and the downstream water diversion tun

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档