施工现场临时供用电施工组织设计(Construction site temporary power supply construction organization design).docVIP

施工现场临时供用电施工组织设计(Construction site temporary power supply construction organization design).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工现场临时供用电施工组织设计(Construction site temporary power supply construction organization design)

施工现场临时供用电施工组织设计(Construction site temporary power supply construction organization design) 1. Project overview (1) this project is * province (city) * engineering, located in * city {east}} {economic development zone}, * road south, * road north, * east side of * street, * west of * street. (2) the construction unit of this project is * province * company, the developer is * company, the design unit is * municipal architectural design and research institute, the supervising unit is * company, and the construction unit is * company. (3) the engineering construction area * m2, the structural situation is {all cast-in-place reinforced concrete frame shear wall}, the total height of the building * m, the total * layer. The first floor of this project is designed for *, and it has {fire control center}, {reporter} room, 2 to * layer design office, * *. The ground floor is designed for {machine room}, the underground floor is designed for {garage}, and the mezzanine design is {self-parking garage}. 2. Construction of power distribution (1) the site design (2) has a capacity of {500} kVA, and the transformer is 10/0.4 kV transformer, which is located at the site of the construction site {northeast}. The location is shown in the general plan (not shown in this article). (2) the low voltage power supply system of this project adopts the tn-s ground system. Radiation type low voltage power supply for {}, directly from the transformer room or box-type substation control (level 1) raises, sent to the distribution of the electric box (ii) and the control, see one, two and distribution system diagram. (3) the distribution box of {5} fixed installation is set up at the site, and the specific configuration of the box is shown in figure 2 (in the case of number 5 distribution box), and the plane position is shown in the general plan (note: this paper is not shown). (4) in line with the on-site fire requirement, the box type transformer substation is in parallel with a switch, which

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档