校园广播节目范文——《地铁》(Campus radio show fan wen - the subway).docVIP

校园广播节目范文——《地铁》(Campus radio show fan wen - the subway).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
校园广播节目范文——《地铁》(Campus radio show fan wen - the subway)

校园广播节目范文——《地铁》(Campus radio show fan wen - the subway) Good afternoon, my dear teachers and teachers, this is the sound campus broadcast of xi an industrial university The first section is the comment section, which is the most popular topic for you. The second plate is the speech plate, which gives you an unusual enjoyment of life. First, I will introduce the basic information of xi an metro line 2 The length of the line 2 line is 26.4 km, with 21 stations. The second line of the forward planning line extends from xi an railway northward to chenjibao of grass beach, with a length of about 6.13km. Function: the line location for xi an north and south to the main traffic corridor, line will administrative center of xi an train north station, xi an, xi an economic and technological development zone, north street in the heart of the city and the tower, south province stadium, small village, xi an TV tower, such as wei song of large passenger hubs together. The northern end of the line connects the west copper highway, the west yan highway, 210 national highway, the south end connects xikang highway, is the south and north to the foreign traffic important road. The second line and line one constitute the cross skeleton of the rail transit network, which is the backbone line in the line network. Line 2 is railway station - north wei of the construction of the recent piece, trunk line, 26.4 km of underground line 20.9 km, completed a total of 23 stations, including 5 station and other rail transit line of the construction of the late change respectively. After the subway line 2 is completed, the train will run at a maximum speed of 80 kilometers per hour, with an average speed of 35 kilometers per hour and about 20 to 35 seconds per stop. The second line is 39 minutes from the railway north station to wei qu. Because the subway is not affected by urban road traffic or weather. During rush hour, the subway train leaves every five minutes and runs from 5:30 to 23:30 in the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档