- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
扬子空调故障代码(The fault code of the Yangtze air conditioner)
扬子空调故障代码(The fault code of the Yangtze air conditioner)
KFR - 23 gw (D),
KFR - 32 gw/C (D)
Fault code failure indication
Temperature sensor fault timing lights flashing
Tube temperature sensor failure sleep light flashing
System breakdown defrost lamp flicker
45 lw KF (R) - (/ D)
E1 high voltage protection disconnect
E2 prevents high load protection
E3 prevents freeze protection
E4 system exception protection
E6 indoor temperature sensor is damaged
E7 indoor coil temperature sensor is damaged
Fault code failure indication
-kf (R) -48lw/A (D).
- KF (R) - 50LW (/ AD).
- KFR - 60 / AD.
- KFR - 70 lw/C (D)
-kf (R) -- 120LW (/ BD)
Fault code failure indication
- E1 high voltage protection disconnect
- E2 prevents high load protection
- E3 prevents freeze protection
- E4 system exception protection
- E6 indoor temperature sensor is damaged
- E7 indoor coil temperature sensor is damaged
Ordinary split machine, 1: the E1 with the light box is shown to stop immediately, except that the light box can be opened and other functions are useless. [simple solution: the control panel of the OVC line and zero line short sub, is still the E1 for panel bad, dont show the E1 is that high pressure protection switch, disconnect] 2: E3 fault some machine doesnt have a low voltage protection switch, but in all control components also is cannot solve the problem, it is now a lot of control panel is common, as long as the LPP line and zero line in the control panel nipple is ok!
Iii. Maintenance information of variable frequency air-conditioning
1. Exhaust temperature protection: when T exhaust is above 115 degrees, the compressor stops, less than 90 degree press stops and the operation is resumed after three minutes.
2. Anti-freeze protection: when the inner tube is less than -1 degree, the compressor stops and the compressor stops for three minutes.
3 over-current protection: when the I is always greater than D, the compressor stops and the external fan is delayed for 30 seconds
32 machin
您可能关注的文档
- 工程经济课后答案(After-school answers to engineering economics).doc
- 工程经济6(Engineering economy 6).doc
- 工程测量试卷A卷期末试题(Project A book A final exam).doc
- 工程结构脆性断裂事故分析(Analysis of brittle fracture accident of engineering structure).doc
- 工程结构(Engineering structure).doc
- 工程规划~城市设计道路管网~(Project planning ~ urban design road network).doc
- 工程财务管理(Engineering financial management).doc
- 工程项目管理选择判断(Project management selection judgment).doc
- 工艺学复习(Process review).doc
- 工程项目管理法(Engineering project management).doc
文档评论(0)