综合厂房起重吊装方案(Integrated plant lifting lifting scheme).docVIP

综合厂房起重吊装方案(Integrated plant lifting lifting scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
综合厂房起重吊装方案(Integrated plant lifting lifting scheme)

综合厂房起重吊装方案(Integrated plant lifting lifting scheme) This article is contributed by kitchkitch Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. Hoisting scheme integrated plant lifting hoisting scheme I. preparation basis: This programme has prepared a reference to the construction manual and the technical operation procedures of construction installation engineering. Construction component quality inspection standard. 2. Project overview: the comprehensive workshop of xx co., ltd. is a joint venture between China and Japan. Located in the new high-tech zone, the building area is 9,800 square meters, and its hoisting task is commissioned by the construction group installation company. The workshop is 18m span, single layer, three-link across workshop, fan side with A span, the vertical axis A, B, C, D, E, F six axis, the horizontal axis is 1-25 axis, the building elevation 13.5 m. The construction period is tight, the task is heavy, the welding quantity is large, the quality is high, the plan is to start from the day of the month, the project is completed by the day of the month, the quality is controlled for good. 3. Operating environment: (see attached diagram) site road is flat, water and electricity, equipped with lifting conditions, concrete The column and the driving beam are to be made on site. 4. Description of hoisting objects: The name of the specifications The weight number The concrete thin ventral roof 18m 9.3 T 88 Concrete column 400 x 700 8.5 T 104 Anti-wind column 400 x 600 9T 12 The concrete column is 400 times 500 6T 20 The driving beam is 400 x 900 3.5 T 144 Roof board 1500 x 6000 1.25 T 810 The panels are 900 times 6000 1T 162 Tiangou plate 580 * 6000 1.5 T 162 Walk plate 800 0.8 T 24 Walk plate 400 0.5 T 48 5. Selection of lifting machine: A number of Considering the lifting capacity of the raw crane, the safety of the road and the economic ben

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档