215建设工程施工管理复习题集(含答案).doc

215建设工程施工管理复习题集(含答案)

2015建设工程施工管理复习题集(含答案) 2014年二级建造师考试真题、模拟题尽收其中,诸多业界权威名师精心解析,精细化试题分析、完美解析一网打尽!二级建造师历年考试真题:/XBCEta 更多精品备考资料及资讯好学-二级建造师交流群:421349720第 1 题 按照合同约定的变更程序,监理公司向建筑公司作出变更指示,须经(  )同意。 企业经理 B.发包人 C.设计单位 D.工程师 正确答案:B, 第 2 题 已知单代号网络计划中某工作最早开始时间和最早完成时间分别为4天和6天,最迟开始时间和最迟完成时间分别为7天和9天,则该工作的总时差为(  )。 好学教育: for examination and approval, to return part or all of the loan in advance. 5.8 contract contract specific requirements: first, the borrower and other clients; Second, loan person double charge and other parties signed a contract with the borrower and agent signature of contract; Third, customers signed loan contract, contract of natural person, must be checked and fingerprinted by himself, you may not use personal name instead be signed, shall not authorize others to sign; Four, the pledgor, mortgagor due to special reasons not to sign the contract, may authorize others to sign the contract and retained after the notary notarized power of Attorney (parties abroad, outside the territory of China sent or delivered by a power of attorney shall be certified by the notary public of the country, and certified by the Embassy or Consulate in the country). Agent required to audit mandates are clear, the content is complete (a power of Attorney sample record form five), whether the expiration date within PART_STORE_00102). Rule2 2nd set of goods was moved to the 2nd from the left the cage inside the vehicle Click on smart properties of oriented window screen to the right of [login rule] the period of validity, and audit the original identity card of the authorized person, and keep copies. Contracts signed by the authorized person authorized, in the signature bar marked authorized person, and signed by the authorized persons name; Five, contract signing and client identity, signature, fingerprint is clear; Six, fill in the contract specification subject to change should be stamped with the account manager in charge name and thumbprint signature by the pa

文档评论(0)

1亿VIP精品文档

相关文档