YRF178 主机安装调试说明.pdfVIP

  • 2
  • 0
  • 约 29页
  • 2017-07-17 发布于天津
  • 举报
YRF178 主机安装调试说明.pdf

YRF178 安装调试说明 邓书春2006-09-12 © Wärtsilä Contents 内容 This presentation provides general information on how to install Wartsila Auxpac and what to be prepared before commissioning. The key points for design installation are also briefly mentioned. /主要讨论发电机组的安装及调 试前的准备,并列出关键的注意点。 Introduction of IPI设计安装指南(工作图)的介绍 Engine Room Aux. system design for Auxpac 发电机组的机舱布置和辅助系 统的设计 Fix the Gensets on the foundation发电机组的安装 External piping system installation 外部管系系统的安装 External electrical system installation 外部电器系统的安装 Pre-conditions for commissioning and start up 调试及动车前的准备工作 © Wärtsilä 2 IPI (Installation Planning Instruction)设计安装指南(工作图) The IPI is made mainly for shipyard’s shipping consultant‘s design purpose, but also includes installation guidelines for Gensets and Aux. systems. Therefore, both the design and production department must read and study it carefully. 工作图主要用于船厂及设计公司的设计,同时也包括了 发电机组和辅助系统的安装信息。船厂的设计和生产部 门都需要仔细阅读这本工作图。 © Wärtsilä 3 E/R Design Aux. System Design机舱布置和辅助系统的设计 Min. distance between Gensets is fulfilled ?发电机组间的最小距离 是否满足? Enough spaces is left for operation and maintenance for both Engine and Alternator? 发动机和电机的操作维修空间是否留出? Lifting device’s capacity and height is enough for maintenance purpose ? 起吊高度和起重能力? Ventilation is enough for engine alternator’s heat radiation combustion exhausting ? 发动机的送风和通风及电机的通风? Correct FO feed pressure / Flow control (mon FO Feed Unit with ME). 正确的燃油进机压力和流量 (特别是与主机共用燃 油供油单元) Cooling water pressure control and HT preheating (esp. when central cooling applied). 冷却水压力正常(特别与主机共用冷却水 系统),高温水予热正常 Exhaust gas pipe expansion compensation. 排气系统热膨胀应予以

文档评论(0)

1亿VIP精品文档

相关文档