2009年二级建筑师市政工程模拟卷部分题与答案(In 2009, the secondary architect municipal engineering simulation volume part and the answer).doc

2009年二级建筑师市政工程模拟卷部分题与答案(In 2009, the secondary architect municipal engineering simulation volume part and the answer).doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2009年二级建筑师市政工程模拟卷部分题与答案(In 2009, the secondary architect municipal engineering simulation volume part and the answer)

2009年二级建筑师市政工程模拟卷部分题与答案(In 2009, the secondary architect municipal engineering simulation volume part and the answer) In 2009, the second class builder municipal engineering simulation volume part and the answer 1. Single topic selection (total 20, 1 point for each question). Only 1 of the candidates in each question are most suitable for the topic. Scene (1) The road structure of the main road of a city is: the road foundation is filled in, the soil height is 2-3m. The road surface is 150mm of base base of 12% limestone soil, 150mm lime fly ash gravel base, asphalt concrete surface layer (coarse grain type 60mm, medium grain 40mm thick), total 100mm, a total of 410mm. Due to the impact of demolition, pavement engineering needs to be organized in winter. According to the scene (1), please answer the following questions: 1. Any compacting mechanical ground subgrade shall be compacted in the optimal water content of the soil. A1 % B2 % C1.5 % D2.5 % Answer: B Analysis: water stability is the best in the best water content. 2. The upper layer of urban trunk road and expressway will need to pass () test to test the rutting ability. A Marshall test B high temperature rut test C. Oil-stone ratio test D residue test Answer: B Resolution: 3. Regarding the construction process requirements of asphalt mixtures, the following statement is wrong () The maximum size of the aggregate of asphalt concrete is gradually increased from top to bottom, and the maximum particle size of asphalt mixture is not more than 1/2 of the thickness. B important asphalt concrete pavement should be built 100-200m test section, mainly divided and test in two stages, obtain corresponding parameters. After the construction of hot mixed asphalt mixture, the surface temperature is lower than 600C before the vehicle can be allowed to pass. D hot mix asphalt mixture of two adjacent spokes and upper and lower horizontal joints construction should be staggered more than 1m. Answer: C Analysis: when the surfa

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档