- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一般砖砌体砌筑技术交底(General brick masonry masonry foundation)
一般砖砌体砌筑技术交底(General brick masonry masonry foundation)
Disclosure content:
Brick masonry
1 range
The process standard is applicable to masonry projects of brick concrete, outer brick internal mold and seismic structural column in general industrial and civil buildings.
2 construction preparation
2.1 materials and main equipment:
2.1.1 brick: variety, strength level must comply with the design requirements, and have the factory certificate, test list. The brick of the clean water wall should be uniform in color and tidy in edges and corners.
2.1.2 cement: the variety and grade should be chosen according to the masonry site and the environmental conditions, and general 325 Portland cement or Portland blast furnace cement shall be adopted.
2.1.3 sand: use medium sand to prepare mortar below M5, the sand content of sand shall not exceed 10%, sand content of mortar of M5 and above shall not exceed 5%, and sieve with 5mm pore size before use.
2.1.4 admixture: lime slaking time not less than 7d, or using fly ash;
2.1.5 other materials: wall drawknot rib and embedded parts, wood brick brush preservatives.
2.1.6 main equipment; should have big shovel, adze, knife, fan, supporting board, wire, small white, tape, iron ruler, leather pole and a small bucket, ash groove, brick clip, broom etc..
2.2 operating conditions:
2.2.1 complete the outdoor and inner core backfill, and install the ditch cover plate.
2.2.2 complete the hidden inspection procedures for foundation and foundation works.
2.2.3 wipe the cement mortar damp layer according to the elevation.
2.2.4 play wall axis line, according to the actual size of the entry brick, pop-up windows and doors position line, line experience to meet the design requirements, through pre screening procedures.
2.2.5 according to the design elevation requirements should be a number of rods, leather count rod spacing from 15 to 20m is appropriate.
2.2.6 mortar shall be prepared by test room and ready to be tested with mortar (6 pieces for on
您可能关注的文档
- 53首适合3岁以下儿童儿歌(53 children under 3 years old).doc
- 60天的神话——给你一个奋起的动力!(60 days of myth - give you a boost!).doc
- 555定时器(555 timer).doc
- 60种早餐的做法(Sixty kinds of breakfast).doc
- 6-专题四 中国近现代社会生活的变迁(6 - the vicissitudes of modern social life in China).doc
- 60电影(60 movies).doc
- 615刺绣(615 embroidery).doc
- 633-学生公寓管理制度(633 - student apartment management system).doc
- 60周年庆相关英语词汇(The 60th anniversary celebration related English vocabulary).doc
- 65条省钱小招式(There are 65 money-saving tips).doc
- 一般腊叶标本的制作(The making of preserved specimen of preserved leaves).doc
- 一般贸易简介(General trade profile).doc
- 一起奥运,一起联想 联想奥运营销回顾与反思(Olympic Games together, lenovo Olympics marketing review and reflection).doc
- 一量VP的语法、语义特点(The grammar and semantic characteristics of a quantity of VP).doc
- 一起说说孕期的那些小毛病(Talk about the little things of pregnancy).doc
- 一金工实习论文(A metalworking practice paper).doc
- 一铺铺旺商铺,决定创业成败(A spread shop, decide the success or failure).doc
- 一键GHOST批处理(转)(1 key GHOST batch processing (rotation)).doc
- 一键多用(One key is multi-purpose).doc
- 一阵大风吹走5万 市民纷纷加入阵营才使损失降低(A gust of wind blew 50, 000 people into the camp to make the loss less).doc
文档评论(0)