2012市政试题第四套(The fourth set of 2012 municipal papers).docVIP

2012市政试题第四套(The fourth set of 2012 municipal papers).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012市政试题第四套(The fourth set of 2012 municipal papers)

2012市政试题第四套(The fourth set of 2012 municipal papers) In 2012, the first class construction division municipal engineering examination questions fourth sets First, individual choice questions (20 questions, 1 points each). Each item options, only 1 of the most to do) 1. material suitable for road base with large traffic capacity and axle load is (). A. water bound macadam B. marl C. graded gravel D. inorganic Aggregate Stabilized Aggregate 2. the soil with the largest pressure and the largest displacement is (). A. active earth pressure B. passive earth pressure C. static earth pressure D. rigid earth pressure 3., the stabilized lime stabilized soil base should be crushed by daily rolling, and the water content during rolling should be within the range of optimum moisture content. A. + 1% B. + 2% C. + 3% D. + 4% 4. () suitable for silt, fine soil, sand soil, pebbles, particle size less than 100 mm, content less than 20% of the gravel soil drilling. A. rotary drilling rig B. circulating submersible drilling rig C. reverse circulation rotary drilling machine Grab drills in D. 5. when the support spacing of urban bridge project is larger than (or) m, the foundation design should be adopted and the concrete or reinforced concrete foundation should be adopted. A.3 B. 4 C.5 D.6 6. when pumping concrete, the pumping interval shall not exceed () min. A.5 B.10 C.15 D.20 7. when the prestressed concrete members are hoisted, the strength of the cement paste of the channel shall not be lower than the design requirements. If the design does not specify, generally not less than () MPa. A.20 B.25 C. 30 D.40 8. 、 grouting technique is adopted in sand layer to reinforce soil by small pipe grouting. A. infiltration B. electric silicification C. high pressure jet D. splitting 9. cast-in-place concrete cantilever beam span is larger than 2 m, Chaimo required the strength of concrete compressive strength of concrete cubes should reach standard value (design). A.50% B.75% C.80% D.100% 10.

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档