- 21
- 0
- 约7.19万字
- 约 75页
- 2017-07-21 发布于湖北
- 举报
The MM module is fully integrated with other modules in the R/3 System. It supports all phases of 物料s 管理: 物料s planning and control, purchasing, goods receiving, inventory 管理, and invoice verification. As a result of this chapter, you should be able to: Provide descriptions of and use of the 物料s 管理 sub-modules. Discuss the integration points between MM sub-modules and other SAP modules Batch 管理 was new for Release 3.0 and represents a cross-application development in the Logistics area. It is linked with all of the Logistics applications (SD, MM, QM, PP). It is therefore structured under th
您可能关注的文档
最近下载
- 矿区生态修复方案编制指南(临时).docx VIP
- 2024事业单位工勤技能考试考前冲刺试卷及参考答案详解(新).docx
- 原调bD海底珍珠容易搵联考钢琴伴奏正谱.pdf VIP
- 江西省南昌市2026届高三年级三月测试(一模)物理试题(含答案).pdf VIP
- 2026年春统编版语文四年级教学进度表.docx VIP
- 养老护理员培训PPT演示课件.ppt VIP
- (高中物理)《传感器》知识梳理.pdf
- (整理版)浙江省宁波市支点教育培训学校八年级数学上册《21等腰三角形》.pdf
- (整理版)浙江省绍兴县杨汛桥镇中学九年级数学上册练习8(无答案)浙教.pdf
- (整理版)特殊四边形的综合应用.pdf
原创力文档

文档评论(0)