东财施工技术作业(Work on construction technology of east finance).docVIP

东财施工技术作业(Work on construction technology of east finance).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
东财施工技术作业(Work on construction technology of east finance)

东财施工技术作业(Work on construction technology of east finance) A, single subject Sink hole filling pile in the cohesive soil construction  when close to the pile bottom elevation of the construction method is    A. Low blow B. heavy hammer blow C. light hammer blow D. Light hammer and low blow Full marks  four points Colligation point, binding mode 2. The roof of the colligation point related to span roof forms and   but be decided by the actual binding when lifting point with water Plane Angle to satisfy  A. 30 ° B. 30 ° to 45 ° 45 ° c. p D. 60 ° Full marks  four points 3. Can be anchored steel strand, steel wire, monofilament reinforced beam and beam more stout reinforced anchorage is    A. KT - Z anchor B. JM12 anchor C. XM type anchor D. Screw rod anchor Full marks  four points 4. The slot type abutment and pier, the differences of pedestal    A. design principle B. Do you need anti-slip checking C. The size of the overturning moment D. The size of the deformation of the pedestal Full marks  four points 5. If more than 24 m roof truss  turn when acceptance of concrete cracking strength is not enough in the process of bottom chord should lower chord  middle really  state   A. Cushioned steel blocks Central suspension C. the middle part is suspended D. both ends are suspended Full marks  four points 6. Scope of application of cold-drawn rate control method is  () A. Rebar with furnace B. Different furnace batches of rebar C. Hot rolled steel D. steel hinge line Full marks  four points 7. When parallel roof brick linoleum   short side take it not less than 150 mm long side lap not less than  A. A 50 mm B. 60 mm C. 70 mm D. 100 mm out  four points 8. Using prestressed concrete steel strand of  the strength grade should not be lower than    A. C20 B. C30 C. C40 D. C50 Out of four points  9. The level of the small block masonry mortar joint thickness and vertical mortar joint thickness is commonly   8 mm a. 10 mm B. C. 12 mm Out of fo

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档