坍塌事故案例分析(Case analysis of collapse accident).docVIP

坍塌事故案例分析(Case analysis of collapse accident).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
坍塌事故案例分析(Case analysis of collapse accident)

坍塌事故案例分析(Case analysis of collapse accident) Section 1 case analysis of collapse accident One, XX highway subgrade engineering soil collapse accident (I) introduction of the accident On April 15, 2004, XX highway project in XX province, in the process of earthwork construction, occurred in the slope of the slope of the slope of the ground in the retaining wall, which caused the collapse of the slope of the slope of the ground, which resulted in the death of five people and injured two. (2) the accident happened On March 2, 2004 XX province some civil engineering construction company to this unit worker wang mou and others went to the construction unit - a company contact XX province for engineering of introduction of enterprise, unit and provide the relevant qualification certificate (business license, construction enterprise quality credit grade card, construction safety certificate, etc.). From the above information to the construction unit, wang and other people will contact the construction of the subgrade retaining wall for the XX section of XX expressway. In the same year, the construction company of the civil engineering construction company gave the construction organization the construction organization design of the road foundation retaining wall in the construction unit on 3 and 13 March. After the examination by the construction unit, it is determined that the company will undertake the excavation and construction of the block wall of the roadbed of XX. On April 5, 2004, the construction unit sent a letter to the construction unit informing it of the bid and asking the construction unit to enter the construction site on April 6, 2004. Collaborative projects contracting and li mou not head of a construction site will inform report, a construction company to sign your name on the notice, and on April 5 in the name of the unit had a pre-contract with construction unit. On April 6, li, in the name of the project department of the construction company of civi

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档