小坪隧道膨胀岩地段的施工(Construction of the expansion rock section of the small flat tunnel).docVIP

小坪隧道膨胀岩地段的施工(Construction of the expansion rock section of the small flat tunnel).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
小坪隧道膨胀岩地段的施工(Construction of the expansion rock section of the small flat tunnel)

小坪隧道膨胀岩地段的施工(Construction of the expansion rock section of the small flat tunnel) Construction of the expansion rock section of the small flat tunnel a To Japan The bao an section of baoan section of baoan section of baoan section, partly through the formation of the expanded rock. Due to the mechanical properties of the expansive rock, many problems are caused. The collapse of the tunnel increased the difficulty of construction. This paper briefly analyzes the characteristics of the expansive rock and its construction measures. [key words] expansion rock tunnel construction An overview, The tunnel is 2919m and the tunnel crosses the watershed. The mountain is high and the natural slope is 30 ordm. ~ 70 ordm; The maximum depth of the tunnel is about 130m. There are 7 V shaped gullies on the surface, and the cutting depth is generally 40 ~ 50m, with the maximum of 75 ~ 80m, and the ditches are vertical and steep. The hole is deep through the chalky sandstone sandwiched mudstone, the formation of the formation is relatively gentle, the general inclination is 5 ordm; ~ 10 ordm; In between. Mudstone contains expansive minerals for purple and red. The granules are thicker, thin - medium thick lamellar, cementing, gluing, soft and easy weathering. According to tests: shale mineral composition of the montmorillonite content of 1.16 ~ 3.66%, illite content of 10.59 ~ 22.95%, kaolinite content of 18 ~ 19%, less than 2 microns of the clay content of 14.5 ~ 27.0%, less than 5 microns occupy 23.0 ~ 42.5%, expansion amount was 3.5 ~ 4.6%, the free expansion rate was 38 ~ 62%. The entire tunnel is 1400m rock formations. The original design of the two sides of the tunnel entrance and exit of the two sides of the hole section of each of the various 10 meters and the rest of the Ming hole section adopt the new arcane construction. In the construction of the construction of the new Olympic construction conditions, the import and export of various 200m change design, change to the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档