挑专项方案(Special programme).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挑专项方案(Special programme)

挑专项方案(Special programme) This article is contributed by keviThe RTF document may not have a good browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. Construction scheme of suspended steel pipe scaffolding A, compiled on the basis of 1, the construction fastener type steel pipe scaffold safety technical specifications (JGJ130-2001) 2, the fourth edition of the construction manual 3, building construction safety inspection standards JGJ59-99-4, working in the construction of higher safety technical specifications (JGJ80-91) 5, specification for design of steel structures (GB50017-2003) 6, load code for the design of building structures (GB50009-2001) 7, the project construction drawings and design changes. Second, the project summary Three salt in the real estate development co., LTD., the development of salt in the building, the project designed by Beijing skyworth era architectural design co., LTD., project scope of four avenue, south to the sun sea moon road on the north, east to peace strand, Westwood irs, a total construction area 23099.98 ㎡; The height of the building is 85.6 m, one floor underground, 22 floors above ground, and the height of the floor is 4.5 m, the first layer is 5.1 m, the second layer is 3.9 m, the third layer is 3.6 m, the standard layer is 3.4 m, the top layer is 5.4 m, and the height of the equipment is 5.1 m. The engineering scaffold under 4 layer adopts temporary shelf (every) and the ground double row scaffolding, temporary use floor every shelf rack with pick, such as underground backfill is complete, decoration engineering Hours to 1-4 layer shall be built from the ground floor scaffolding, scaffolding landing riser pad under the 1000 * 250 * 50 board share concentration for the uniformly distributed load, other data like picking rack. From the 4th floor to the 22nd floor, the steel cantilevered frame is selected twice, on the fourth and 13th floors respe

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档