铝板资料的解释(Interpretation of aluminum sheet data).docVIP

铝板资料的解释(Interpretation of aluminum sheet data).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
铝板资料的解释(Interpretation of aluminum sheet data)

铝板资料的解释(Interpretation of aluminum sheet data) Clown patent: 3.1 process measuring unreeling to check up embedded parts, install rear, metal structure installation to connect lightning protection to anti-corrosion treatment, fire insulation installation to install metal panel, sealing, note glue to drench water test, surface cleaning 3.2 operation method 3.2.1 measuring and releasing line: from the control point of the structure elevation, the control point of the axis and the line retesting the benchmark control line of the curtain wall. According to the design requirements of positioning and size, Firstly, the position control points and lines are measured on the floor and wall of the first floor. Then using the theodolite or laser lead vertical, the vertical control line and the control line of the facade center are pointed upward at the Angle and center of the curtain wall, and then the construction line is made by the weight of the steel frame hanging wire with a fixed structure. The horizontal elevation control line of each layer is measured with the level of the level and the standard steel ruler. Finally, the installation position line of the horizontal and vertical frame is installed according to the design of the large sample and the vertical, center and elevation control line. 3.2.2 check the embedded parts and installation of the embedded parts: the embedded parts of the embedded parts shall be buried in the structure according to the design provided. The curtain wall should be controlled by position control line, midline and elevation control line (point) before construction, check and check the embedded parts, and the normal position size allows the deviation to be plus or minus 20mm, and the elevation allowable deviation is plus or minus 10mm. Structure of location error, leakage during the construction of embedded parts, buried or design change not buried should be dealt with according to the design requirements or fill up the rear, rear and built-in

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档