- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
河南安装03版定额部分解释(Henan installation 03 edition quota part explanation)
河南安装03版定额部分解释(Henan installation 03 edition quota part explanation)
1, a civil engineering construction unit and air conditioning installation units, respectively, with party a signed a construction contract. In the process of construction, installation units to finishing construction materials, acceptance to a civil inspection unit. Q: does the construction company charge management fees in addition to the installation fee?
Answer: the construction unit and the installation unit is equal, and the construction units are not installed unit finishing completion materials from the essence, therefore, can only be charged with civil party to Party A cannot charge fees, management fees to the general installation unit.
2, a unit to ask what is the ninth volume ventilation and air conditioning engineering quota in the P99 216 item in 4# means?
Answer: ninth volumes of ventilation and air conditioning engineering quota P99 216 item in the 4# at the fan impeller diameter length (decimeter number).
3, steel and flexible waterproof sleeve quotas, sub diameter refers to the nominal diameter of casing or casing in charge of the nominal diameter
Answer: in the fixed and flexible steel waterproof casing fixed quantity index of nominal diameter refers to the nominal diameter of casing wear in the head.
4, a construction unit in the construction of bridge, the bridge between the two sections of the cross connection using LJ-16 bare copper wire, both ends of the bolt fixed. Ask, this jumper can apply the grounding jumper section? Answer: do not apply to the grounding jumper section. The content of the bridge installation quota includes the grounding content.
5, Q: 03 ~ 11-2203 11-2199 version of the installation quota items in material galvanized steel 8 0.5 unit kg is wrong? Answer: 11-2199 ~ 11-2203 item galvanized steel. 0.5 unit kg is wrong, the right should be M2.
6, Q: 03 edition installation quota thirteenth volumes, thirty-third pages of material sand unit price 70 yuan /kg w
您可能关注的文档
- 电化学法练习.doc
- 电器材料清单.doc
- 电器相关黑盒练习.doc
- 电场和电场在电场中的运动.ppt
- 电子加热器.doc
- 电场现场审查实践.doc
- 电子控制审查信息 2.doc
- 电子技术问题分析.doc
- 电子控制引擎练习.doc
- 电子控制引擎概述.ppt
- 河南省标准设计图集目录(Atlas of standard design in Henan Province).doc
- 法国品牌一览(List of French brands).doc
- 法国地名(French place names).doc
- 法国罢工导致管理绝大多数炼油厂陷入瘫痪(The French strike led to the paralysis of the vast majority of refineries).doc
- 法官职务序列设置暂行规定(Interim Provisions on the establishment of judges' rank).doc
- 法律上的人,拉德布鲁赫,舒国滢译txt(A legal person, Radbruch, Shu Guoying TXT).doc
- 法学方法论(Methodology of law).doc
- 法律不调整思想的理由(The reason that the law does not adjust the mind).doc
- 法律专业人才培养方案(Law professional training program).doc
- 法律基础知识讲义(Lectures on fundamentals of law).doc
文档评论(0)