测量施工方案(Measurement construction plan).docVIP

测量施工方案(Measurement construction plan).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测量施工方案(Measurement construction plan)

测量施工方案(Measurement construction plan) 瑞海·嘉 Lang River View Garden Centre Island ($number plot) Logging Of Oxfam Unido Parties Text Construction Unit: Hainan Province second Construction Engineering Company Prepared by: Zhang Xinzhong Auditor: Date: 2008-9-16 Catalog compilation Project Overview Measure the preparation work before construction Establish Construction Control Network Measuring lofting Construction of Flat lofting Axis control Elevation Survey Settlement observation Quality control Measurement organization and Instrument configuration The basis of surveying and compiling I. Project Overview: 1. Project name: 瑞海·嘉 Lang River View Garden 2, Construction Unit: Hainan Expressway real Estate Development Co., Ltd. 3, Project location: Hainan June 海瑞海·嘉 Lang River 4. The project is a frame structure. Total construction area of 115299.42 square meters, of which the underground construction area of 680.9 ㎡ floor area of 114618. M2. Green area of 51528.22 ㎡. Construction land area of 98351.12 ㎡. 4 24-storey, 2 18-storey, 16-storey 11-storey Villa 3, 3-storey Villa 2, will be composed of the swimming pool, the ground ± 10 buildings into a single, conjoined, special-shaped body group building design, by the Hainan II Construction Engineering Co., Ltd. General package. The construction plan of surveying organization is drawn up before construction. II. Pre-construction Survey preparation work: 1, according to the characteristics of the project, combined with the various sections of the site layout characteristics, considering all kinds of favorable conditions, assembly-line travel and some unfavorable factors in construction, the overall application and detail control scheme is adopted to ensure that the plane position and single conjoined position of the group and the different position conform to the design requirement, so as to finish the project construction on time and quality and quantity within the contract period. 2, in order to do a precise measurement and

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档