基础接地(Foundation Grounding).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基础接地(Foundation Grounding)

基础接地(Foundation Grounding) Lightning protection and grounding concealment engineering construction scheme (2011-07-07 11:00:13) reprint print Tags:. First, lightning protection and grounding system instructions: The grounding system of all kinds of grounding systems adopts the TN-S system, and the design requires that the grounding resistance is no more than 1 ohms. Pile foundation and pile cap and beam steel mesh welding connected to form the basis of reliable grounding the grounding device, lightning protection downlead reinforced by column or shear wall in two with a diameter of 16 mm above, welding with upper and lower welding and roof lightning protection, grounding device, installed lightning protection belt is arranged in the roof wall daughter, concrete frame building the reinforcement in the network and lightning with reliable connected to form a lightning arrester, all outstanding roofing metal components or piping shall be welded and communicated with the roof lightning belt in the bathroom for local equipotential bonding. Two, construction deployment: 2.1 construction process: basic grounding electrode welding, lead down line, pressure equalizing ring welding, roof lightning protection belt welding, equal equipotential bonding, ground test, well construction, ground resistance test 2.2 construction progress control point: The 2.2.1 level of grounding body and pile pile four main reinforcement concrete pouring pile inserted in the welding operation to beam outlet elevation. The 2.2.2*** column base level grounding body welding column inserted in the basal layer of rebar after * * *. 2.2.3 the local equipotential bonding of each floor is inserted into the floor after binding. 2.2.4 roof lightning strips are installed after the top of the civil structure is inserted. 2.2.5 test well construction is inserted after the top of the civil engineering structure. 2.6 phase test grounding resistance value: During the foundation grounding electrode construction, the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档