- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基础接地(Foundation Grounding)
基础接地(Foundation Grounding)
Lightning protection and grounding concealment engineering construction scheme (2011-07-07 11:00:13) reprint print
Tags:.
First, lightning protection and grounding system instructions:
The grounding system of all kinds of grounding systems adopts the TN-S system, and the design requires that the grounding resistance is no more than 1 ohms. Pile foundation and pile cap and beam steel mesh welding connected to form the basis of reliable grounding the grounding device, lightning protection downlead reinforced by column or shear wall in two with a diameter of 16 mm above, welding with upper and lower welding and roof lightning protection, grounding device, installed lightning protection belt is arranged in the roof wall daughter, concrete frame building the reinforcement in the network and lightning with reliable connected to form a lightning arrester, all outstanding roofing metal components or piping shall be welded and communicated with the roof lightning belt in the bathroom for local equipotential bonding.
Two, construction deployment:
2.1 construction process: basic grounding electrode welding, lead down line, pressure equalizing ring welding, roof lightning protection belt welding, equal equipotential bonding, ground test, well construction, ground resistance test
2.2 construction progress control point:
The 2.2.1 level of grounding body and pile pile four main reinforcement concrete pouring pile inserted in the welding operation to beam outlet elevation.
The 2.2.2*** column base level grounding body welding column inserted in the basal layer of rebar after * * *.
2.2.3 the local equipotential bonding of each floor is inserted into the floor after binding.
2.2.4 roof lightning strips are installed after the top of the civil structure is inserted.
2.2.5 test well construction is inserted after the top of the civil engineering structure.
2.6 phase test grounding resistance value:
During the foundation grounding electrode construction, the
您可能关注的文档
- 古埃及、古希腊及古罗马神话入门简介(A brief introduction to myths of ancient Egypt, ancient Greece and Rome).doc
- 古文-冷泉亭记(The ancient pavilion - Cold Spring).doc
- 古时称谓(Ancient appellation).doc
- 古汉语同义词辨析的途径_以_制_度_为例(_ way of ancient Chinese synonyms in _ system _ _ degree as an example).doc
- 古罗马建筑特色赏析(Appreciation of architectural features in ancient Rome).doc
- 古诗词常用字词、意象(Commonly used words and images in ancient poetry).doc
- 古龙群侠传全攻略(Energy-saving.).doc
- 古风诗词发展的轨迹(The development track of ancient poetry).doc
- 古龙群侠传港服升级表和挂狗秘籍(Energy-saving port service upgrade and hang dog.).doc
- 古诗词满分解密(Full decryption of Ancient Poems).doc
- 2024年05月山东交通职业学院招考聘用博士研究生50人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月安徽芜湖市弋江区老年学校(大学)工作人员特设岗位公开招聘2人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东东营河口区教育类事业单位招考聘用22人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东交通职业学院招考聘用100人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东威海职业学院招考聘用高层次人才2人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月安徽石台县事业单位工作人员33人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东滨州市博兴县事业单位公开招聘考察笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月安徽蚌埠固镇县湖沟镇选聘村级后备干部7人笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东省安丘市教育和体育局所属事业单位学校公开2024年招考232名工作人员笔试历年典型题及考点剖析附带答案含详解.docx
- 2024年05月山东临沂临港经济开发区工作人员(5人)笔试历年典型题及考点剖析附带答案含详解.docx
文档评论(0)