- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年造价师考试速记口诀(2010 cost engineer exam shorthand formulas)
2010年造价师考试速记口诀(2010 cost engineer exam shorthand formulas)
[transfer] 2010 cost engineer exam shorthand formulas [picture]
One, remind
1, 09 of the fees deleted engineering quota measurement fees.
2, the cost of measures (environmental protection fees, civilized construction costs, safety construction fees, temporary facilities fees) merged into safe and civilized construction costs.
Concrete, reinforced concrete formwork and scaffolding support fees, charges into a professional project (measures of concrete and reinforced concrete formwork and frame construction fee is listed as professional project measures; scaffolding fee is listed as construction engineering, decoration engineering and municipal engineering professional measures project).
Increased construction costs (during winter and rainy seasons) and fees for temporary protection facilities on ground, underground facilities and buildings.
Construction drainage, precipitation fees split into (construction drainage fee, construction precipitation fee).
In addition: the night construction increased fees, two times transportation costs, large machinery and equipment import and export field and security fees, the project has been completed and equipment protection fees have not changed.
Two, measures fee
1, tonight rain night increased construction costs increased \ winter rains increased construction costs
Professional large machinery two shift professional measures #92 project; large machinery and equipment import and export and security \ two handling costs
The ground and underground buildings need to protect the temporary protection facilities on the ground, underground facilities and buildings
Drainage work has also been completed, construction drainage fee \ construction precipitation \ completion of the project and equipment protection fees
Measures to ensure safety and civilization are guaranteed, and measures such as safety and civilized construction fees can be kept in mind
2 and two moving expenses
Wi
您可能关注的文档
- 5.2 晶体电光效应和应用.ppt
- 5-2电机和拖动基础-变压器空载运行.ppt
- 5.3 液体精馏-1.ppt
- 5.2意识作用(综合版).ppt
- 5.创新行销突破.doc
- 5-1铣床电气控制PLC改造.ppt
- 5.PowerPoint习题和答案.doc
- 5S基本要领和实施方法.ppt
- 5-6拉伸和压缩强度条件和应用.ppt
- 5.1_方案构思方法.ppt
- 2010年雅思作文题目(IELTS composition 2010).doc
- 2010感动中国十大人物颁奖词及其事迹(2010, the words and deeds of the ten great figures of China).doc
- 2010年高考英语词汇表c(2010 English vocabulary for college entrance examination C).doc
- 2010暑假住宿班(2010 summer stay).doc
- 2010语文学业水平测试模拟(2010 language proficiency test simulation).doc
- 2011上半年书单推荐(The first half of 2011 on the recommended list).doc
- 2010自主招生试题(2010 independent recruitment examination questions).doc
- 2011会计电算化实务题操作流程详解(2011 accounting computerization problems, detailed operation process).doc
- 2011书目(2011 bibliography).doc
- 2011年6000名左右录取情况(In 2011, about 6000 admissions).doc
文档评论(0)