技术员一年工作总结(Summary of technical staffs work for one year).docVIP

技术员一年工作总结(Summary of technical staffs work for one year).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
技术员一年工作总结(Summary of technical staffs work for one year)

技术员一年工作总结(Summary of technical staffs work for one year) 200X is in the past year, the new year is about to begin, in this new year, review the work process over the past year, a summary of years of experience and lessons, to avoid in the future work, better technical work, following several aspects of the work of the past year a summary: First, this years main work: As a technician, installed at the budget, I follow the rules and regulations of the company and the timely completion of the installation, operation of the quality management of construction. 1. technical management: In the past year, a total of 6 buildings in new construction drawings, and timely review of the notice on the contents of the construction personnel. Drawings in time after the preparation of construction organization design and technical disclosure, and issued to the construction personnel. In the construction process, many newly-built projects and projects under construction and several times according to the requirements of Party A for warm water engineering to negotiate changes due to design drawings to meet the use of lack of function, often party a temporary change occurred in the construction process, for the visa before construction changes are done timely and accurately. Some cannot visa in construction, after the construction is completed, immediately conducted a visa. 2. data management: For the construction of new projects are in accordance with the project schedule, timely and accurate collection of material certificate, material test, covert project acceptance, quality acceptance batch inspection, project quality inspection, timely find and seal the party in land engineer, engineer signature, in order to make the construction data of each test group, sub division, covert acceptance, materials testing date to coincide with the actual date of construction, to meet the requirements of data preparation. 3. preparation of budget and final accounts: This year, a total of XX copies o

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档