- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
zte认证考题-管线专业(ZTE certified examination questions - Pipeline professionals)
zte认证考题-管线专业(ZTE certified examination questions - Pipeline professionals)
This paper contributed by redbearlt.
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
A RadioButtonList, 1, buried cable lines in the ordinary soil, hard soil, deep trenches for aged (C) M. A, 0.8 B, 1 C, 1.22 and 8 meters of cement rods were buried in common soil (B). A, 1.4 meters, 1.5 meters, 1.6 B C, 3 meters hanging in the terminal rod and the angle is greater than the (C) angle of the rod should be end. A, 5 meters, 10 meters, 15 B C, 4 meters below the statement correctly is (B) A, B, laying pipe can cross well pipe should be beyond the first cable rack, 150mm C pipe in the pipe can have a joint D, tube hole can not block 5, suburban line line pole distance (C) A, 35 B, 40 - 40 - 45 - 50 C, 45 D, 50 - 556, a new vertical pole, 8 meters of cement pole in hard soil pole pole hole depth should be: (C) A, 1.2 meters, 1.3 meters, C B 1.4 meters, 1.5 meters, 7 D overhead cable line across the road when the minimum vertical spacing for cable (C) M. A, 4 B, 5 C, 5.58, a mark number, the following statement is wrong (B) A, each hop numbers as an independent unit, and the number of adjacent relay section has nothing to do with B, B, A number from the end end, C, according to the loop counter clockwise order number can not A, B, D direction end end number can be in accordance with the provisions of the design documents, can also according to the relevant provisions of completion documents
9. The distance between the buried optical fiber cable and the water supply pipe (below 300MM) shall be A meters. A, 0.5, B, 1, C, 1.510, terminal rod, incoming rod, approach station (A) root pole must be installed directly into the ground lightning line. A, 5, B, 8, C, 1011, and standard stones generally have a depth of (B) cm, and the excavated part is 40 cm. A, 50 B, 60 C, 8012, of overhead cable suspension
您可能关注的文档
- 手机维修的工具和刷机软件(Mobile maintenance tools and brush software).doc
- 手的斗与簸箕(Bucket and dustpan hand).doc
- 手自一体驾驶方法(Hand in hand driving method).doc
- 手表的基础知识(Basic knowledge of watches).doc
- 手自一体变速器使用方法(Hand to hand transmission use method).doc
- 打印机偏色汇总(Printer color summary).doc
- 打开可信网站通道,globalsign宣布推出增强型 evssl 30 天试用型数字证书管理(Open the trusted web channel, globalsign announced the introduction of enhanced evssl 30 day trial digital certificate management).doc
- 打架检讨书(Fight book).doc
- 打败黑客的10款安全的linux发行版本(10 safe Linux release versions of defeating hackers).doc
- 托业单词(TOEIC word).doc
文档评论(0)