- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设流程(Construction process)
建设流程(Construction process)
I. establishment stage of project construction
Examination and approval department: development and Reform Commission (investment of under 100 million yuan project)
Application materials:
(1) 1 copies of the admission opinions;
(two) 1 photocopies of the business license of the company;
(three) apply for 1 copies of the project
(four) 1 copies of the project proposal
(five) project declaration disk 1
Approval content: project approval
Approval time limit: 2 days
Two, project approval phase of environmental protection
Approval department: Environmental Protection Bureau
Application materials:
(1) approval of the project 1 copies;
(two) 1 copies of the declaration form
Examination and approval content: Notice of environmental protection advice or record form
Approval time limit: 3 days
Three, site selection stage
Approval department: Planning Bureau
Application materials:
(1) 1 written applications for site selection;
(two) 1:500 present situation, topographic map, drawing and CD each 1
(three) land department, land ownership, or the identification of the land red line 1
(four) 1 copies of the assessment report and approval opinions of the geological hazard;
(five) the EIA opinions of the industry sector must be issued in 1 copies
(six) 1 copies of the approval plan of the Planning Commission
(seven) development qualification certificate (necessary for development unit);
Approval content: planning red line, construction site selection notice, construction project design conditions and requirements notice,
Approval time limit: 4 days
Four, the state-owned land use right transfer contract and state-owned land use warrants
1, approval department: Land Bureau
Application materials:
(1) 3 copies of the approval of the NDRC project;
(two) 3 copies of the design conditions, requirements notices and drawings of the planning and construction works;
(three) 3 copies of the agreement signed by the enterprise and the Administrative Committee;
(four) fea
您可能关注的文档
- 为什么(Why).doc
- 为奴十二年(Twelve years as a slave).doc
- 为人处世的五种人的五种方式(Five ways of dealing with five kinds of people).doc
- 为所有动物不受虐待(Be free from cruelty to all animals).doc
- 为孩子打造安全网 购买少儿保险的八大理和五大攻略(For children to build a safety net, buy children's Insurance eight, Dali and five major Raiders).doc
- 习作一按照自己的心愿设立一个节日(Exercise 1 set up a festival in accordance with your wishes).doc
- 乌盆计【后本】(一名奇冤报;一名定远县)(根据《戏考》第一册整理)2010年11月08日修正(Ukrainian basin plan [after this] (A rare injustice reported; one Dingyuan county) (according to the drama Book 08), revised on November 2010).doc
- 乌兰巴托见闻(Ulan Bator knowledge).doc
- 书家必携(They will bring).doc
- 书斋画室联(The study combined studio).doc
- 工勤综合知识题库及答案.docx
- 高岭土中游离石英含量的测定方法 (2).pdf
- 2025年最新工勤考试收银审核员(高级技师)考试题及答案.docx
- 在初中道德与法治课教学中如何运用互动式教学模式的探.docx
- 2025事业单位考试公共基础知识考试试题(附含答案).docx
- 高中音乐教育中数字资源的创新应用与教师培训教学研究课题报告.docx
- 2025危险化学品生产单位安全生产管理人员考试题模拟考试题库及答案.docx
- 2025至2030全球及中国固体燃料试验行业市场深度研究及发展前景投资可行性分析报告.docx
- 白血病考试试题及答案.docx
- 2025至2030全球及中国固体粒子计数器行业市场深度研究及发展前景投资可行性分析报告.docx
文档评论(0)