建设流程(Construction process).docVIP

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设流程(Construction process)

建设流程(Construction process) I. establishment stage of project construction Examination and approval department: development and Reform Commission (investment of under 100 million yuan project) Application materials: (1) 1 copies of the admission opinions; (two) 1 photocopies of the business license of the company; (three) apply for 1 copies of the project (four) 1 copies of the project proposal (five) project declaration disk 1 Approval content: project approval Approval time limit: 2 days Two, project approval phase of environmental protection Approval department: Environmental Protection Bureau Application materials: (1) approval of the project 1 copies; (two) 1 copies of the declaration form Examination and approval content: Notice of environmental protection advice or record form Approval time limit: 3 days Three, site selection stage Approval department: Planning Bureau Application materials: (1) 1 written applications for site selection; (two) 1:500 present situation, topographic map, drawing and CD each 1 (three) land department, land ownership, or the identification of the land red line 1 (four) 1 copies of the assessment report and approval opinions of the geological hazard; (five) the EIA opinions of the industry sector must be issued in 1 copies (six) 1 copies of the approval plan of the Planning Commission (seven) development qualification certificate (necessary for development unit); Approval content: planning red line, construction site selection notice, construction project design conditions and requirements notice, Approval time limit: 4 days Four, the state-owned land use right transfer contract and state-owned land use warrants 1, approval department: Land Bureau Application materials: (1) 3 copies of the approval of the NDRC project; (two) 3 copies of the design conditions, requirements notices and drawings of the planning and construction works; (three) 3 copies of the agreement signed by the enterprise and the Administrative Committee; (four) fea

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档