装修简单流程汇总(Simple decoration, Flow Summary)
装修简单流程汇总(Simple decoration, Flow Summary)
Decoration all process and simple description worth reading (plagiarism + summary, for your reference)
I. wall and top paint (interior wall coating)
1, remove the old plaster (new original putty layer or good quality can not eradicate the grassroots, to save the old wall such as sand; the real texture is loose should eliminate all 1:3 5--10mm thick cement mortar).
2, brush interface agent again.
3, wall cracks and joints with crack bandage (insulation wall, light partition wall should be filled with sand, paste dacron cloth or full nail plasterboard as crack processing).
4, batch scraping 821 putty, 2---3 times for wall leveling.
5, sandpaper polished, local rest, and then polished.
6, remove dirt.
7. Roll or coat the interior wall paint 2---3 times.
Two, wallpaper, wall covering
1, remove the old plaster (new original putty layer or good quality can not eradicate the grassroots, to save the old wall such as sand; the real texture is loose should eliminate all 1:3 5--10mm thick cement mortar).
2, brush interface agent again.
3, wall cracks and joints with crack bandage (insulation wall, light partition wall should be filled with sand, paste dacron cloth or full nail plasterboard as crack processing).
4, batch scraping 821 putty, 2---3 times for wall leveling.
5, sandpaper polished, local rest, and then polished.
6, remove dirt.
7, and then brush varnish again.
8, with professional wallpaper glue plus latex paste.
Three wall tiles
1, the eradication of the original wall tiles (if required).
2, 1:3 cement mortar, smooth 10mm thickness.
3, wall chiseling or napping treatment.
4, the wall pop-up horizontal and vertical lines.
5, the water does not bubble to tile with 1:2 cement mortar paste (positive corner edge angle bump).
6. White cement or joint sealant.
Four, insulation wall
1, wall drill, nail into the wood.
2, wall fixed 30 * 40 pine keel.
3. Adding polystyrene board, fixing cement pressure plate or gypsum board.
Five, li
您可能关注的文档
- 微机原理课程设计(Course design of Microcomputer Principle).doc
- 微观经济学练习题23txt(Microeconomics exercises 23txt).doc
- 微观经济答案(Microeconomic answer).doc
- 德国联邦银行货币政策工具的改革与完善(Reform and perfection of German Federal Bank's monetary policy tools).doc
- 心电图机的原理及结构(The principle and structure of electrocardiograph).doc
- 必修二地理总结(Compulsory two geographical summary).doc
- 微观经济学复习(Microeconomics review).doc
- 心理测量(Psychometrics).doc
- 开发话术(Word development).doc
- 必修二地理(Compulsory two geography).doc
- 制动系统的特点项目一58课件.pptx
- 直接工程费价外运杂费填料费铁路工程施工组织与概预算78课件.pptx
- 主备用控制中心的切换LCF300型25课件.pptx
- 智能交通系统的相关技术任务三车辆自动驾驶技术王怡安徽交通6.pptx
- 智能交通监控系统任务三城市交通诱导系统诱导系统的组成王怡安.pptx
- 智能交通监控系统任务二城市交通监控系统王怡安徽交通67课件.pptx
- 直升机的特点和分类空气动力学基础与飞行原理86课件.ppt
- 直升机的飞行性能空气动力学基础与飞行原理67课件.ppt
- 职业形象塑造3职业教育国际邮轮乘务管理专业教学化妆与形象设.pptx
- 轴向拉压杆件的线应变和胡克定律张亚琴河北交通52课件.pptx
文档评论(0)