- 1
- 0
- 约8.32千字
- 约 6页
- 2017-07-24 发布于河南
- 举报
甲供材料核算方法的探讨(Discussion on the accounting method for material supplied by armour)
甲供材料核算方法的探讨(Discussion on the accounting method for material supplied by armour)
Discussion on the accounting method for material supplied by a cost engineer
In the process of real estate development, the material cost accounts for about 65% of the cost of the project development (except land). In order to ensure the quality of the project and save the cost of the project, the real estate development and management company usually adopts the form of one supply material for the engineering materials.
The so-called material supplied by Party A, is the construction side and the construction side between the material supply, management and accounting method, which the real estate developers in the construction bidding and construction unit signed a construction contract, the developer for the party, stipulated in the contract of the project in the main material used by the Party (the development of a unified purchase of materials), the settlement price in accordance with the actual settlement price, in accordance with the number of Party A (developer) allocated to Party B (construction unit) the number of settlement. In the method of material supply, the material price risk is borne by the developer, and the quantity risk of the material is borne by the construction unit. The development of materials required for the construction unit calculation according to the construction drawings, lists of materials supply, each construction unit according to the amount of material needed to advance the progress of the project budget reporting plan, development units unified purchase management, the project payment settlement will remove this part of the money from the settlement amount of material.
From the point of view of the real estate project cost control and management perspective, management of material supplied by Party A accounting method does have its advantages, mainly in saving material procurement costs and reduce the payment to the construction of material preparatio
您可能关注的文档
- 洗车设备解说(Car washing equipment commentary).doc
- 洗衣机波轮好还是滚筒好(Washing machine impeller or roller good).doc
- 洛克人zxa攻略(Rock people zxa Raiders).doc
- 洛阳好吃的美食及饭店推荐大全(Luoyang delicious food and hotel recommendations).doc
- 洛阳沿途讲解(Luoyang explains along the way).doc
- 注塑车间管理(Injection shop management).doc
- 活下去的动力(The motive force to live).doc
- 洪仕斌洗衣机市场洗时代来临管理(Hong Shibin washing machine market washing era management).doc
- 活力和谐 喜人画卷(Vitality, harmony and gratifying pictures).doc
- 流水行船问题的解法(The problem of water solution of sailing).doc
- 申论热点促进旅游业发展的对策(On the hot spots the countermeasures to promote the development of tourism industry).doc
- 申通保价还有保丢不保损之说(Shen pass insured value, but also to protect the loss of non - loss protection theory).doc
- 申请e读api所需信息 - 贵州师范大学(Apply for e read API required information - Guizhou Normal University).doc
- 电信围墙的倒塌(The collapse of Telecom fences).doc
- 电信,看清自己的路(Telecommunications, see your own way).doc
- 电力 文明(Electric civilization).doc
- 电信系毕业论文题目(Graduation thesis title of telecommunication department).doc
- 电力一线员工个人总结(Personal summary of power line staff).doc
- 电力事故(Power accident).doc
- 电力企业与erp(Power enterprises and ERP).doc
原创力文档

文档评论(0)