- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二建公路工程实务(Construction of highway engineering practice)
二建公路工程实务(Construction of highway engineering practice)
Case 1
1. background
A highway for the highway, a total length of 146.6 km, cost 7 billion yuan, is the national key traffic projects. A Luqiao company has obtained the construction task of filling embankment in a section of the project. In order to fulfill the construction tasks, the project department in the preparation of construction organization, decided to adopt the horizontal layered construction method, determine the construction procedures for sampling, transportation, Chu Ping, bulldozer grader, leveling roller, and formulated the construction essentials of embankment fill:
(1) control each layer of filling fabric evenly, loose thickness of not more than 30cm, the best water content under the condition of rolling.
(2) the slope of the slope is not steep at 1:5, and the base conforms to the technical specification for highway subgrade construction (JTJ033 - 1995). When section 5.1 stipulates that the embankment can be built directly on the natural subgrade. Ground slope is steeper than 1:5, ground surface should be into step (step width not less than LM), and rammed with a small ramming machine. By filling the lowest step of filling, and then tamped by Taiwan to fill, tamped after all steps is completed, can be carried out according to the general soil.
(3) highway and the highway, cross slope steep section of cut and fill subgrade, the steps must be tilted inward from the fill slope to dig in the hillside, the step width should not be less than lm.
(4) different soil mixed embankment, the soil filling permeability smaller in lower embankment, two-way cross slope 4% should be made; as for the filling level, should be covered by filling in more permeable soil on the embankment slope.
(5) in order to ensure the compacted quality of embankment fill, the soil of different nature should be mixed and stirred to fill and compaction.
(6) fine soil which does not change its volume due to moisture or freezing and
您可能关注的文档
- 八一文艺汇演主持词(Presided over the August 1st Theatrical Festival).doc
- 八上生物重点(Eight, focus on Biology).doc
- 八下思品作业本答案(Eight think of the solution).doc
- 八下物理(Eight physics).doc
- 八下思品作业本(Eight think of the exercise book).doc
- 八下生命科学练习册答案(Eight Life Sciences workbook answers).doc
- 八下第一单元《相亲相爱一家人》综合测试题(Eight unit 1, love each other family comprehensive test questions).doc
- 八下语文作业本(Eight Chinese homework book).doc
- 八冶建设集团有限公司(Eight Metallurgical Construction Group Co., Ltd.).doc
- 八十大寿庆典仪式主持词-祝寿词-第一范文网(Eighty birthday celebration ceremony presided over the word - birthday words - the first college.).doc
- 二手房交易税费及注意事项(Second-hand housing transactions taxes and fees and notes).doc
- 二手汽车转让协议书(样本)_百度文库(The second-hand car transfer agreement (sample) _ Baidu Library).doc
- 二手汽车选购常识(Second hand car buying common sense).doc
- 二月的色彩---色彩原理初步教学(Color in February -- principles of Color Teaching).doc
- 二星级闪亮句子表达(Two star bright sentence expression).doc
- 二楼后座(The two floor, the backseat).doc
- 二年级课外阅读书目(Extracurricular reading bibliography for grade two).doc
- 二氧化碳气驱强化采油(CO2-EOR)的原理(Principle of enhanced production (CO2-EOR) by carbon dioxide gas drive).doc
- 二级C上机编程题答案之结构体题型(Two level C computer programming questions, answers to structural questions).doc
- 二灰土施工的质量控制及施工技术总结(Summary of quality control and construction technology of two lime soil construction).doc
文档评论(0)