中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure).doc
- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure)
中国管理资讯网--知识库--如何建立有效的WBS结构(China Management Information Network -- knowledge base -- how to build an effective WBS structure)
China Management Information Network -- knowledge base -- how to build an effective WBS structure? Your present position: China management information network, case library, project management, full text
How do you build an effective WBS structure?
Author: Zhang Peng from: project management exploration update: 2006-3-2 popularity: 259
In the process of project management, project planning and control is a very important link, good project planning can
At the same time, the project schedule, quality and investment are well controlled, and the failure of project planning is possible
Confusion, loss of control, or even eventual failure of the project.
In the process of project planning, people often turn to the WBS method to decompose the content of the project. stay
On this basis, the allocation of resources, schedule, and estimate the cost of the project. WBS as the project size
The difference is not the same. A small project requires only a simple WBS structure and a partitioning base of the structure
It is clear at first and the results are easily recognized. The bigger the project, the more important the WBS is,
From another angle, the harder it is to do well. For large projects, the WBS structure of a project is often determined
Can be done overnight, need to be repeated feedback, correction, and finally can be accepted by all parties to a project
WBS structure.
There are many ways to divide the WBS structure of a project, such as division by profession, division by subsystem and sub engineering,
Each method has its advantages and disadvantages according to different stages of the project. In general, determine
The WBS structure of the project needs to be combined with several methods, using different methods at different levels of WBS.
Then, what are the methods and principles that need to be followed to determine the WBS structure of a
您可能关注的文档
- --华安盛道管理网 生产线平衡的定义(Definition Huaan Shengdao management network production line balance).doc
- ACAA认证室内设计师模拟题2(ACAA certified interior designer mock 2).doc
- 73慢性风湿性心瓣膜病(73 chronic rheumatic valvular heart disease).doc
- Adobe_Illustrator_CS4快捷键2(Adobe_Illustrator_CS4 shortcut key 2).doc
- ary材质详解(Detailed description of ary material).doc
- Eviews时间序列分析实例(An example of Eviews time series analysis).doc
- 2011年中考语文备战(中考专题复习)古诗鉴赏专题(Chinese preparation for senior high school entrance examination in 2011).doc
- eye candy 4000(养眼花瓶 4000).doc
- 6(肺痨阴阳气血虚)(6 (yin and yang qi deficiency syndrome)).doc
- IT人职业规划(IT career planning).doc
文档评论(0)