加筋挡土墙(reinforced earth wall)

加筋挡土墙(reinforced earth wall) 2 construction operation and quality control 2.2.1 foundation construction, to dig out the surface soil and high liquid limit clay, and the bearing layer is weathered sandstone or the stratum that meets the design bearing capacity. The depth of foundation excavation is more than 50cm. If the geological situation changes greatly during construction, we should contact the design units in time so as to make corresponding treatment measures. After foundation pit excavation, it should be finished and compacted, and should not be handled when the design capacity is not satisfied. The 2.2.2 panel of prefabricated wall panel must be used for prefabricated steel formwork, steel mould and floor to regularly check and repair, removal of concrete residues on the template, each brush demoulding agent after prefabrication, to ensure that the precast panel is smooth, achieve the design precision. The panel shall be provided with a tight bore to ensure tact. In order to ensure the quality of concrete, the mechanical vibration, such as surface roughness without slurry, can use the same cement sand mortar on the surface of received light treatment, so smooth and beautiful. Check the standard panel for qualified strength; 0.5% length error is no more than 5mm or the length of the diagonal; two error is not greater than 10mm or the maximum diagonal length of 0.7%; the thickness error between +5mm ~ -3 mm; surface flatness error is not greater than 4mm or long (wide) 0.3%. There is no obvious deviation between the ribs and the tendons. Panels that do not meet the above standards are strictly prohibited. 2.2.3 panel safety 1) the first floor panels should be installed on the top of the clean strip foundation, accurately draw the outer edge of the panel line, curve section should be properly encrypted control points. Then, on the outer edge of the designated line, and horizontal measurement, according to the length of the scribe line segmentation, leveling boa

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档