吉林油田公司大情字井油田2011年扩边加密产能建设工程(Jilin Oilfield Company well word well oilfield in 2011 to expand the edge encryption capacity construction project).doc
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吉林油田公司大情字井油田2011年扩边加密产能建设工程(Jilin Oilfield Company well word well oilfield in 2011 to expand the edge encryption capacity construction project)
吉林油田公司大情字井油田2011年扩边加密产能建设工程(Jilin Oilfield Company well word well oilfield in 2011 to expand the edge encryption capacity construction project)
Jilin Oilfield Company well word well oilfield in 2011 to expand the edge encryption capacity construction project
Environmental impact public information
Entrusted by Jilin Oilfield Company, the Jilin Institute of Environmental Science undertook the environmental impact assessment work of the Jilin Oilfield Company in 2011. According to the national ring Impact Assessment Law and the State Environmental Protection Administration of public participation in environmental impact assessment procedures (UNCED [28] No. 2006) the relevant requirements of legal documents, in the preparation of an environmental impact report process, report to the Jilin provincial Environmental Protection Bureau approval, the basic situation and the environmental impact of the project the evaluation information of second publicity, hope that the majority of the public to actively participate in, put forward valuable opinions on the construction of the project.
I. brief introduction to the basic conditions of the project
1, the project name: Jilin Oilfield Company well word well oil field 2011 expansion edge encryption capacity construction project
2. Project brief
According to 2011 the overall planning of Jilin Oilfield Company, be in Daqingzi oilfield has proven reserves of deployment of development wells 118, of which 104 wells, 14 water wells, after the completion of the project annual production of new oil 5.68 * 104t; the whole project operation period of total new capacity of 30.69 * 104t.
And supporting the ground construction, including the construction of 3 measuring water distribution and new repair between the wells 5.2km; the new construction of the trunk pipeline 57.2km, all glass lined seamless steel pipe. The new water injection pipeline 22km is made of seamless steel tube. The total area of this project is about 109.31hm2, and the ty
您可能关注的文档
- 初级经济师辅导资料16(Primary economist guidance materials 16).doc
- 初高中英语的衔接(Cohesion between junior and senior high school English).doc
- 制作假玉的材料(The material for making fake jade).doc
- 制粒机环模失效原因(Failure reason of ring die in granulator).doc
- 制鞋针车工基础知识培训教案(Shoe needle Turner training plan).doc
- 剑术入门(Introduction to fencing).doc
- 刻录失败故障分析与解决(Failure analysis and solution of burning failure).doc
- 剑侠2外传奥运问答(The 2 Musketeers outside the Olympic Q & A).doc
- 剑杆织机的常见故障的维修与保养(Maintenance and maintenance of common failures of rapier looms).doc
- 剑桥大学名言(University of Cambridge Quotes).doc
文档评论(0)