建筑填空(Fill in the blanks).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑填空(Fill in the blanks)

建筑填空(Fill in the blanks) The drainage pipeline is usually composed of transverse branch pipe, vertical pipe, underground dry pipe and discharge pipe. Open automatic sprinkler system is generally divided into three kinds: rain system, water curtain system and water spray fire extinguishing system. Three main causes of water loss of water seal include self siphon loss, induced siphon loss and static loss. 1 each kind of water supply system can be arranged according to the laying position of the horizontal dry pipe, such as down, up, up, down, middle and ring. 2 the laying of water supply pipe has two forms: bright and dark. 3 the introduction of the pipe into the building has two conditions: one is through the shallow foundation of the building, the other is through the load-bearing wall or foundation. 4 pipeline protection, corrosion protection, antifreeze and anti dew, leak proof, anti vibration. 5 the water pressure and water quantity needed by the internal water supply system of the building is the basic basis for selecting pressurization and water regulation and water storage equipment in the water supply system. 6 design method of water flow in building water supply pipeline: empirical method, square root method and probability method. 7 design flow per second is based on the sanitary water supply equivalent of the building and the water supply equivalent to the water supply in the pipe section. 8 the purpose of hydraulic calculation of water supply network is to determine the pipe diameter, water head loss of the pipe network and the pressure required by the water supply system. 9 flexible rubber joints shall be installed on the pump suction pipe and outlet pipe. 10 when the vibration isolation measures are taken for the foundation and pipe of the water pump unit, the elastic support shall be adopted for the pipe support, which has the double functions of fixing the erection pipeline and isolating vibration. 11 pressure water supply equipment according to the s

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档