建筑物沉降观测,前视读数,后视读数,前视标高,什么意思及市政测量工作心得!(What do you mean by building subsidence observation, front view reading, back reading, front view elevation And municipal measurement work experience!).doc

建筑物沉降观测,前视读数,后视读数,前视标高,什么意思及市政测量工作心得!(What do you mean by building subsidence observation, front view reading, back reading, front view elevation And municipal measurement work experience!).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑物沉降观测,前视读数,后视读数,前视标高,什么意思及市政测量工作心得!(What do you mean by building subsidence observation, front view reading, back reading, front view elevation And municipal measurement work experience!)

建筑物沉降观测,前视读数,后视读数,前视标高,什么意思及市政测量工作心得!(What do you mean by building subsidence observation, front view reading, back reading, front view elevation And municipal measurement work experience!) 1. building subsidence observation, forward reading, back reading, front elevation, what do you mean? In leveling, to measure the elevation of the instrument point, it is necessary to know the elevation of the original point (that is, the starting point of the elevation) The instrument frame, after the first view alignment, because after the point of view of ground elevation, the known ground elevation and instrument reading level ruler reading, is the instrument of elevation, and then on the point to be measured, the view (marks on buildings), because the level of sight is horizontal. So to see the readings and instrument forward-looking point is the same elevation, while the bottom elevation scale is high minus the reading instrument So there are nbsp; front view elevation = instrument elevation - forward reading = rear view elevation + rear view reading - front view degree Settlement observation: if the front view is regarded as the observation point and observed on the given date, the settlement of the front view can be known by comparing the elevation of the observation record. Surveying work is to determine the location and elevation of the design and construction drawings at the scene. Basically, the instruments used are the level of the level and the location of the total station. It is often a master measurement and an assistant performs the task on the spot. First, said the construction side of the elevation, the elevation is put in the setting out of pile position, measure the existing elevation of the corresponding point, and then use the design elevation minus the corresponding point elevation difference is the scene that existing, the elevation. Then, the construction team or construction team shall be responsible for the construction of the elevation difference, a

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档