- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
拦渣工程(Slag stopping project)
拦渣工程(Slag stopping project)
3 slag removal project
3.1 general provisions
3.1.1 development and construction projects in the capital construction and production operations, resulting in a large number of abandoned soil, abandoned stone, slag, tailings and other solid waste, must set up a special site for stacking, and construction of slag works.
3.1.2 according to the location and terrain characteristics of abandoned soil, abandoned stone and abandoned slag, appropriate slag control project is set up to control soil erosion effectively. Its main forms are:
1 dam (tailings dam). The construction of dam (tailings dam) shall be built in the ditch where the spoil, spoil, tailings and tailings are piled up.
2 slag wall. Spoil, abandoned stone, slag heap, prone to collapse, or piled up in the slope and the slope surface, construction of retaining wall.
3 slag dyke. If the abandoned soil, abandoned stones or abandoned slag are placed beside the ditch or the river course, the slag stopping dyke shall be set up according to the flood prevention control line. The slag stopping dike has the requirement of flood control and should be laid out with the flood dike.
3.2 dam (tailings dam)
The upstream flood treatment of the 3.2.1 dam shall comply with the following requirements:
1 tailing dam upstream flood is small, take the guide flood or drainage, flood drainage to the tailing dam spillway discharge or imported from Hongdong, will flood discharge.
There are 2 large flood tailing dam upstream, the tailing dam upstream dam construction, in this case, the scale of tailing dam spillway, flood relief in Hongdong, by the flood control flood interval combined with the adjustment of two dams.
There are 3 large flood tailing dam upstream, and conditions of the dyke construction, can the construction of flood control and tailing dam, and debris and flood control two functions. But it must be proved by technical and economic analysis to establish its rationality.
Treatment of sediment in
您可能关注的文档
- 徐州公交路线(Xuzhou bus route).doc
- 待人处事的100条忠告(100 Tips for dealing with people).doc
- 徐冰《烟草计划》(Xu Bing's tobacco project).doc
- 徐州市城市房屋拆迁管理办法(Measures for the administration of urban housing units in Xuzhou).doc
- 徐工奥数(Xugong Olympiad).doc
- 影视、娱乐、动漫趣味知识问答(Film, entertainment, animation, fun, knowledge, quiz).doc
- 徐悲鸿的马(Xu Beihong's horse).doc
- 徐盛(Sheng Xu).doc
- 循环式时间观与宿命式的荒凉--以《金锁记》为例探讨张爱玲的时间观(The circulating time concept and fate -- a desolate Golden Lock as an example of Eileen Chang's concept of time).doc
- 循环水泵出口安装止回阀的问题(The problem of installing a check valve at the outlet of the circulating pump).doc
- 持续销售的关键--掌控力(The key to sustained sales - control).doc
- 指甲反映健康(Nails reflect health).doc
- 挑战市场需求 把滞销产品卖出去(Challenge the market demand and sell the unsalable products).doc
- 指针式MF47型万用表使用说明(Instructions for the use of pointer type MF47 multimeter).doc
- 挑战极限 Oracle数据库一秒导百万数据(Challenge the limit Oracle database lead millions of data per second).doc
- 挑战零损耗极限的武器—TPM(A weapon that challenges zero loss limits - TPM).doc
- 挤压丝锥底空算法(Extruding tap bottom empty algorithm).doc
- 挤塑板与聚苯板的对比(Comparison of extruded board and polystyrene board).doc
- 挤塑聚苯乙烯泡沫板(Extruded polystyrene foam board).doc
- 招教考试重点题(Key questions of recruitment examination).doc
文档评论(0)