erp实施难点(ERP implementation difficulties).docVIP

erp实施难点(ERP implementation difficulties).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
erp实施难点(ERP implementation difficulties)

erp实施难点(ERP implementation difficulties) Although there will still be material changes after configuration, the number of changes will be much lower. Implementation consultant: constraint is the bottleneck In the ERP implementation process, APS is the most difficult part of the implementation, of course, does not deny that enterprises must first solve the BOM related issues. The most difficult part of APS is the constraint problem. The first is the restriction of resources, including the maintenance of resources, the change of efficiency, the sharing of resources, the allocation of major resources and secondary resources, etc.. Second is order constraint, but sometimes there is a swap between processes. Third, material constraints. The ability of enterprises not only in the production capacity, including the supply capacity of the material, but the ability to handle constraints is a problem, now most users will be regarded as a management problem, that MRP will not appear similar problems. But in fact, how to make corresponding adjustments after the occurrence of material constraints and how to provide appropriate information for management, these two problems have not been solved. Project Director: process is the root Analyzing problems from a process point of view can identify the root cause of the problem. A process is composed of multiple activities and links, and in the process of circulation, different activities may involve different departments. Problem analysis of the process requires that the project team start from the specific activities of the process and seek the concrete links and root causes. For example, a furniture company, the company chair BOM cannot be determined, then analyze the reasons, mainly because of the color change (customers may also have variable) and fundamental problem solving, it needs to be done through the process of product configuration; in raw materials, aluminum (chair required material) is a standard requirement however, the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档