aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane).docVIP

aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane)

aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane) AQ3421 tower crane safety operation rules.Txt I wonder how many people are separated or still in love?. His laugh to cry yourself to watch their own trouble. You use stealth to avoid me, I use stealth to help you! Until one day, in the hands of power, kill all the world, bear my dog. This article is contributed by liuxian_520 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Safety operation regulation of tower crane AQ3.4.2.1 (1) the crane rail foundation or concrete foundation must pass through the design, inspection before use, should be based around the building slope and drainage facilities, and to maintain a safe distance from the pit. (2) the tower crane foundation soil bearing capacity must be in strict accordance with the original provisions or comply with the use: medium tower is 8 ~ 12t/ square meters the heavy tower, 12 ~ 16t/ square meters. (3) the tower crane disassembly must be carried out by dismounting the qualification certificate issued by the administrative department of construction of the professional team, due to technical and security personnel present disassembly monitoring. (4) and personnel should wear safety protection products, should fasten the safety belt when working at height, and familiar with conscientiously implement the disassembly process and operation rules. (5) the wind reached four above shall not be lifting, installation, disassembly. Lifting must be checked before the hydraulic lifting system components connected. The rotary arm is strictly prohibited during lifting Bar and other homework. (6) after the installation of tower crane, the technical inspection and adjustment should be carried out by stages, and the inspection qualified, before delivery. In no load, the vertical deviation of tower and the ground shall not be more than 4/1000. motor and hydraulic device

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档