- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane)
aq3421塔吊安全操作规程(Safety operation rules of aq3421 tower crane)
AQ3421 tower crane safety operation rules.Txt I wonder how many people are separated or still in love?. His laugh to cry yourself to watch their own trouble. You use stealth to avoid me, I use stealth to help you! Until one day, in the hands of power, kill all the world, bear my dog. This article is contributed by liuxian_520
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Safety operation regulation of tower crane
AQ3.4.2.1
(1) the crane rail foundation or concrete foundation must pass through the design, inspection before use, should be based around the building slope and drainage facilities, and to maintain a safe distance from the pit. (2) the tower crane foundation soil bearing capacity must be in strict accordance with the original provisions or comply with the use: medium tower is 8 ~ 12t/ square meters the heavy tower, 12 ~ 16t/ square meters. (3) the tower crane disassembly must be carried out by dismounting the qualification certificate issued by the administrative department of construction of the professional team, due to technical and security personnel present disassembly monitoring. (4) and personnel should wear safety protection products, should fasten the safety belt when working at height, and familiar with conscientiously implement the disassembly process and operation rules. (5) the wind reached four above shall not be lifting, installation, disassembly. Lifting must be checked before the hydraulic lifting system components connected. The rotary arm is strictly prohibited during lifting Bar and other homework. (6) after the installation of tower crane, the technical inspection and adjustment should be carried out by stages, and the inspection qualified, before delivery. In no load, the vertical deviation of tower and the ground shall not be more than 4/1000. motor and hydraulic device
您可能关注的文档
- eclipse快捷键(eclipse快捷键).doc
- eas hr实践系列十一九州通医药--中国民营医药商业龙头(EAS HR practice series Eleven Kyushu medicine - China's private pharmaceutical business leader).doc
- e8_8控制命令(E8_8 control command).doc
- eclipse的使用技巧详解(Eclipse use skills detailed).doc
- eclipse签名(eclipse签名).doc
- elearning(电子学习).doc
- efx安装教程(EFX installation tutorial).doc
- eoq模型(EOQ model).doc
- eminem的经典歌词(Eminem classic lyrics).doc
- erp习题集锦(ERP exercise highlights).doc
- arcgia制作地图(Arcgia making maps).doc
- arm 的指令结构(The instruction structure of arm).doc
- arm与x86架构之争(臂与x86架构之争).doc
- as3 一些常用物理公式(AS3 some commonly used physical formulas).doc
- arm_lcd(arm_lcd).doc
- asking兄的交易心得(Asking brother's trading experience).doc
- as3神奇的贝塞尔曲线(AS3 magical Bessel curve).doc
- atlcimage 的透明通道的处理与格式转换(Processing and format conversion of transparent channel of atlcimage).doc
- atx电源的标准 对比(Standard comparison of ATX power supplies).doc
- au3命令详解(Au3 command detailed).doc
文档评论(0)