实务-施工管理.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
实务-施工管理

实务-施工管理 1A420161 familiar with material purchasing and storage Requirements of material procurement for engineering projects Purchase amount of 50 thousand yuan or more (including 50 thousand yuan), must sign an order contract. (3) according to the basic principle of ABC classification: Class a factor, the cumulative frequency of 0% to 80% range of factors, that is the main factor, should be focused on management; The factors of class B from 80% to 90% are defined as secondary factors, and secondary problems should be managed; Class C factors determine the factors from 90% to l00%, that is, general factors, and should be appropriately strengthened according to the conventional methods. The above method is called ABC classification management. Therefore, according to the ABC classification, the engineering solid wood decorative door and window Aluminum Alloy, joinery board, tile key management; floor materials in this project should be carried out secondary management; the project in a white cement, gypsum board, alkyd enamel, emulsion, sand and other materials as a general management content. 1A420170 management of building construction machinery and equipment (plus) (should be a multiple-choice question) P318 Generally speaking: 1. the excavation of a large area with little depth should be carried out by bulldozers or loaders, and the earth will be transported with a dump truck; 2. for large excavation with large length and width, a scraper can be used to shovel soil, carry earth, unload soil and fill the ground; 3. for the more deep foundation, the hydraulic shovel with 0.5 or 1 bucket capacity is adopted, and the upper earthwork can also be carried out by scraper or bulldozer; 4., if the operating surface is narrow, and there is groundwater, soil moisture is large, hydraulic backhoe can be used to dig the soil, dump trucks to transport soil; 5. digging in the underground water, you can use dragline, higher efficiency; 6. of the underground water level is deep, do

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档