2009年全国二级建造师水利水电工程实物真题与详解(In 2009 the national two construction division of water conservancy and Hydropower Engineering and detailed physical exam).docVIP

2009年全国二级建造师水利水电工程实物真题与详解(In 2009 the national two construction division of water conservancy and Hydropower Engineering and detailed physical exam).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2009年全国二级建造师水利水电工程实物真题与详解(In 2009 the national two construction division of water conservancy and Hydropower Engineering and detailed physical exam)

2009年全国二级建造师水利水电工程实物真题与详解(In 2009 the national two construction division of water conservancy and Hydropower Engineering and detailed physical exam) 2009 two construction division of water conservancy and Hydropower Engineering Management and practice papers First, individual choice questions (20 questions, 1 points each). Each item options, only one of the most to do) 1., according to water conservancy and hydropower project classification and flood standards) (S1252 - 2000) provisions, a pumping station, engineering and other II, and secondly, the building level should be () level. A.2 B.3 C.4 D.5 2. the fineness modulus (Mx) of the sand used in the concrete of a sluice bottom slab is 2.6, which belongs to () sand. In A. coarse B., C. is fine, D. is very fine 2.B [analysis] the fineness of sand is expressed in terms of fineness modulus (Mx). The greater the Mx, the coarser the sand. Mx is coarse sand between 3.7 and 3.1, Mx is between 3 and 2.3, medium sand is Mx, between 2.2 and 1.6 is fine sand, and Mx is between 1.5 and 0.7. 3. the workability index of dry concrete mix is () A. Vebe consistometer B. stratification C. slump D. viscosity 3.A [analysis] for dry concrete workability (slump less than 10mm), using Vebe consistometer (VB) as its workability index. 4. of a hydropower project is located in a narrow valley, on both sides of steep terrain, rock solid mountain river, the whole design diversion cofferdam method, this project should adopt (Guide). A. beam narrow channel B. open channel C. D. tunnel culvert 4.D [analysis] diversion tunnel is the tunnel excavation on the riverbank, in the pit on the downstream cofferdam construction, during construction by the river water discharge tunnel. This diversion method is suitable for the narrow valley, on both sides of steep terrain, rock solid mountain rivers. 5. when the borehole is blasted, the critical hole depth for shallow and deep holes is (m). A.3 B.4 C.5 D.6 5.C [analysis] hole diameter less than 75mm, depth

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档