- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年造价员基础知识辅导(Basic knowledge of cost staff in 2010)
2010年造价员基础知识辅导(Basic knowledge of cost staff in 2010)
(2) the plinth construction survey: construction survey includes the basic orientation, foundation pit line and leveling and positioning based on the template.
(3) Column Installation Survey: in order to ensure the installation of the flat position and elevation of the column according to the requirements, the center point of the cup and the elevation of the bottom of the cup shall be inspected, and the length check and the adjustment of the bottom of the cup shall be carried out. When the column is inserted into the cup, vertical correction is necessary.
(4) crane beam installation survey: crane beam installation survey, mainly to ensure the crane beam center position and beam elevation to meet the design requirements. Therefore, before the crane beam is installed, the position of the center line of the crane beam, the elevation of the beam surface and the elevation of the bracket surface shall be checked.
(5) basic equipment and pre buried bolt testing equipment foundation construction program has two kinds: one kind is the equipment foundation construction in plant, and the plant after the completion of plinth part; the other is a plant foundation and equipment foundation construction at the same time. In accordance with the construction of the former procedure, an internal control network shall be laid before the construction of the plant wall, which shall be the basis for the installation of the equipment and the installation of the equipment. If the latter procedure is adopted, the end point of the main central line of the equipment foundation shall be measured on the workshop control network. When the equipment foundation formwork or embedded anchor bolts, local wood plate or copper plate set, to measure the center line of the bolt group.
In order to prevent errors, the center line measuring drawing should be drawn before positioning, and the center line and anchor bolt central line shall be marked on the
您可能关注的文档
- 大理旅游攻略(Dali Travel Guide).doc
- 大连vray,渲染器(Dalian Vray, renderer).doc
- 大队委竞选演讲稿(Team election campaign speech).doc
- 天天都是环境日(演讲稿)(Every day is the day of the environment (speech)).doc
- 天才儿子 目录(Sons of genius catalog).doc
- 天正建筑最常用的几十个快捷键(Dozens of shortcut keys are used most frequently in buildings).doc
- 大有临海产业园区(Large waterfront industrial park).doc
- 太阳电池用晶硅材料(Crystalline silicon materials for solar cells).doc
- 天津旅游(必知)(Tianjin tourism (know)).doc
- 外贸信函(Foreign trade letter).doc
文档评论(0)