2011年煤矿机电队工作总结及2012年工作计划(Work summary of coal mine electromechanical team in 2011 and work plan in 2012).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年煤矿机电队工作总结及2012年工作计划(Work summary of coal mine electromechanical team in 2011 and work plan in 2012)
2011年煤矿机电队工作总结及2012年工作计划(Work summary of coal mine electromechanical team in 2011 and work plan in 2012)
Work summary of coal mine electromechanical team in 2011 and work plan in 2012
2011 will soon be over, review this year, three teams in the mine electromechanical government under the correct leadership, earnestly implement the production and management of the mine issued, through the tireless efforts of all the workers to achieve safe production in 2011, the main work of this year the summary is as follows: the completion of a team, the equipment maintenance, installation and processing in mine issued indicators, and a level of the team in strict accordance with the requirements of higher authorities, the completion of all tasks assigned on time, the main work includes the following 1 aspects, installation and maintenance of this year well the maintenance of motor and pump, winch for more than 30 times; the two roller warehouse maintenance time; installation 6-22170, 0-22140, e d e 0-22150 two three, 6-22220 two and sub Ding machine multi points driving belt 6; on the other Outside the installation e two new head of a mountain high motivation and demolition of an old head. Install a water tank for an office building; change the gate to the north of the factory; install the 3 door of the family area. All these work save a lot of maintenance and installation costs for the mine. In particular, the installation of Ding, 6-22220, two, in overcoming the installation distance is far from the poor installation conditions, it took two days to complete, but also the fastest installation this year. 2, in coordination with combat, four teams of electrical and mechanical installation of reactor 2; assistance (reprinted from one million library network , one million library network, more than 1 million articles of secretarial templates, free download) Beishan replaced two transformer oil; assist the shop two 30 passengers. 3, processing mainly completed: the numbe
您可能关注的文档
- 学生张家界自助游攻略(省钱、省力、省时间旅游路书)(Students in Zhangjiajie travel Raiders (money, effort, time travel notes)).doc
- 学科门类(Discipline category).doc
- 学车日记(Learning diary).doc
- 学风建设主题班会——交流学习方法,提高学习效率(Learning style construction, theme class meeting -- exchange learning method to improve learning efficiency).doc
- 安全保障义务篇(Security obligations).doc
- 安全文明施工组织设计(Safety and civilized construction organization design).doc
- 安全员考试试题及答案(Safety officer examination questions and answers).doc
- 学好cad技巧(Learn CAD skills well).doc
- 安全知识及员工手册(Safety knowledge and employee handbook).doc
- 宇宙战将全知识(The universe will full of knowledge).doc
文档评论(0)