04年一级建造师建筑工程经济真题及答案(04 years of a construction division construction project economic Zhenti and answers).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
04年一级建造师建筑工程经济真题及答案(04 years of a construction division construction project economic Zhenti and answers)
04年一级建造师建筑工程经济真题及答案(04 years of a construction division construction project economic Zhenti and answers)
First, individual choice questions (60 questions, 1 points each). Each item options, only 1 of the most to do)
1. in the following items, the cash outflow from the capital financial statement of cash flows is ().
A. depreciation expense
B. amortization expense
C. accounts payable
D. income tax
2. in the following statement about the cash flow chart, the error is ().
A. takes the horizontal axis as the time axis, and zero represents the starting point of the time series
The intersection of the arrow line and the time axis paid by the B. is the time unit of the cash flow
C. the value of the lumen cash flow at the arrow line
The arrow of the D. vertical arrow is in the direction of a particular person
3. the nominal annual interest rate is r, and the total annual n is the annual effective interest rate.
4., in engineering economic analysis, the following items of financial evaluation index, which belongs to the dynamic evaluation index is ().
A. investment yield
B. debt service reserve rate
C. financial internal rate of return
D. loan repayment period
5. in the financial evaluation of the project, if a plan is feasible, (.
A.PtPc, FNPV0, FIRRic
B.PtPc, FNPV0, FIRRic
C.PtPc, FNPV0, FIRRic
D.PtPc, FNPV0, FIRRic
6. a productive projects, converted to the end of the first year investment amounted to 48 million yuan, the net cash flow of second at the end of the year was 12 million yuan, 15 million yuan at the end of third years, fourth years since the beginning of the end of all 16 million yuan, until the tenth years period, while static investment payback period for the construction project (years).
A.4.24
B.4.31
C.4.45
D.5.24
7. the interest reserve rate represents the guaranteed rate of interest for the use of the item.
A. profits after taxes are paid
B. profits before payment of taxes and interest payments
C. pays profits before interest and taxes
D. profits after
您可能关注的文档
- 道路容量.doc
- 道路二级公路设计设计.doc
- 通讯设备腐蚀知识简介.ppt
- 道路土方工程.doc
- 道路工程课程介绍.doc
- 道路延伸施工方案 6.2.doc
- 道路工程(方法)施工方案.doc
- 道路技术标准.doc
- 道路三维交叉设计.ppt
- 道路描述 1.doc
- 05-06年高三语文第六册期中测试1309(05-06 high school language sixth book period test 1309).doc
- 05-06年高三语文第六册期中测试5996(05-06 high school language sixth book period test 5996).doc
- 05二注构造与电气真题(05 note two structural and electrical test).doc
- 05-路由器基础知识问答篇(05- router basics Q & A).doc
- 05年11月(2级)(05 years November (Level 2)).doc
- 06 旅游 彩之云南-云贵高原丽江香舍十七日全集攻略(06 tourism color Yunnan - Yunnan Guizhou Plateau, Lijiang incense house seventeen full text Raiders).doc
- 06——07药用植物学(06 - 07 medicinal botany).doc
- 05年11(05 years 11).doc
- 06款新秀数据流(06 new talent data streams).doc
- 06矿山(06 mines).doc
文档评论(0)