2005年压力管道设计试题(Pressure piping design questions in 2005).docVIP

2005年压力管道设计试题(Pressure piping design questions in 2005).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2005年压力管道设计试题(Pressure piping design questions in 2005)

2005年压力管道设计试题(Pressure piping design questions in 2005) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Pressure piping design examination The width of the 13. pipe corridor should be considered a certain reserved width, and the main pipe rack should be left under consideration of its load. The pipe in the pipe corridor can be arranged into single layer width, and should not be more than 10m. A danger or double layer 10%~20% margin, and take the three floor. Pipe gallery It can be arranged when necessary Section 1 fill in the blanks. 1. the pressure piping is divided into GA1, GA2 and GB1 according to the design category Full name Score 14. the degree of danger of fire and explosion can be divided from the production point of view to the level of design , Secondary danger; a danger Device causing The three security measures for layout design are, first of all, the prevention of long distance pipelines, GB2, public pipes, GC1, and industrial pipelines in accordance with the regulations concerning fire protection and explosion prevention. Piping materials, grades, secondary hazards. GC2, When the 15. pipe corridor crosses the road, the clearance height is as follows: the overhaul way within the device is not less than not less than 5.0m, and the railway is not less than 5.5m; the passageway under the corridor is not less than 4.5m 3M 4.5m. Factory Road 2. to four design documents signed by the calculation of pipe stress analysis. Equipment arrangement drawing Piping layout The design of the 16. reactor and the furnace arrangement spacing should not be less than the pressure of the pipe should be set or cross hole drill pipe jacking pipe to protect the casing or increase the thickness of the tube wall with catalyst and inspection of the platform, the reactor side should warm pump line, and maintenance and repair, renovation unit. In addition to the mobile crane, the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档